2014-07-15

Su-Kam has installed over 1.3 MW of Solar Power PV Systems at various North Eastern locations of Assam Rifles - Indian Army Su-Kam Power Systems Limited, the leading player in the power back-up industry in India, has installedover 1.3 MW of Solar Power PV Systems at various North Eastern locations of Assam Rifles - Indian Army. The project was awarded to Su-Kam throughRajasthan Electronics and Instrument Limited (REIL). The project required Su-Kam to supply, install, commission and maintain off-grid solar power systems at various remote Assam rifles base locations in Manipur, Nagaland, Tripura, and Mizoram& Assam. The Assam Rifles Project was the 1st project undertaken by Su-Kam in powering up the headquarters of the Indian Army in the North East region of the country. The lack of adequate power supply at these remote locations had increased the dependence of the Army on cumbersome sources of power back up solutions like diesel generator sets with huge depend

ence on

non-renewable sources of fuel like diesel. Out of the 18 sites, 50 KWp solar installations have been made at each of the 10 sites with the remaining 8 sites having an installed capacity of 100 KWp each. All the plants have been installed under MNRE subsidy scheme as per Jawaharlal Nehru National Solar Mission in India. Complete Project Installation and Maintenance by Su-Kam Su-Kam has used high quality, best-in-class solar products that include Su-Kam made Solar Inverters, Charge Controllers, Tubular Gel batteries and Advanced Remote Monitoring Software for the Assam Rifles project. All the solar power plants installed by Su-Kam for Assam Rifles are up and running successfully. Su-Kam's team of engineers is maintaining these sites regularly. The company's highly advanced Remote Monitoring Software also enables the team to detect any problem in the system from a faraway location in real time. Therefore, in case of any bre

akdown

in the system, Su-Kam's highly efficient & dedicated service team is able to attend to the complaint within 48 hrs even in remote sites. In addition to the above, Su-Kam had also taken initiatives in employing local personnel at these sites and trained them in installation, commissioning and upkeep of the solar power plants. The trained personnel have also been posted at these areas to maintain the set up in these sites now. Benefits from the solar installation The installation of solar PV power systems at these remote locations of the Assam Rifles has enabled them to draw huge benefits from the same: Huge Savings - As most of these sites were running on fuel guzzling & bulky diesel generator sets, the solar PV systems have brought down the dependence of these sites on generator sets thereby reducing the cost of diesel consumption by 50% of the initial cost of procurement and actual cost of the fuel!
Reduced dependence on grid supply - Drastic reduction of dependence of these sites on intermittent electricity supplied from the grid Regulated use of power - The Solar PV system provides power to a dedicated load thereby avoiding use of DG sets which cannot be regulated for a fixed power supply according to the requirement. This regulation in turn helps in saving precious fuel Noiseless, Pollution free & Eco-Friendly power Use of high efficiency components for higher output - Though the Solar Irradiance level in the North East Region of India is lower (Insolation level - 3.5 ) than that of other parts of the country (Insolation level - 4.5 - 5), the Su-Kam team used High Efficiency solar components in the systems which are running successfully and giving optimum output Power Saving for other applications - Th

e Solar

PV plant helps in saving conventional energy & fossil fuels thereby more conventional energy can be made available for other applications Reducing the Carbon Footprint - The utilization of the renewable source of energy of the sun is also contributing towards a greener environment Challenges Faced Site development - Due to the hilly and rough terrains, it was a huge challenge for the Su-Kam team to develop the sites to make them feasible for solar PV Installation as the solar panels required to be placed at specific orientations to derive maximum power from the sun. The team stayed in the tough army camps for the complete duration of the project to develop the site for solar PV installation like making space in the dense vegetation, leveling the ground, setting up of control rooms for monitoring etc. Transportation -

Raw

material transportation was a big challenge as all the sites were at remote locations & the roads were not in well maintained or good conditions. Taxis were also not readily available for carrying raw materials. This caused breakage of PV panels while transportation & shortage of other equipments. If any related materials had to be purchased locally, the cost for the same was 5-6 times higher than the original cost. Communication Problems - Due to unavailability of mobile network at various sites, it was not easy to communicate with other members of the team. The team also had to face language problems while interacting with the local populace at these sites Inhospitable Weather Conditions - Civil work was affected severely due to continuous rain. However, in order to complete the project within the stipulated time, the team had to work on the field even though it was raining heavily
Unavailability of Trained Manpower- Unavailability of trained manpower was also a major problem in these regions & labour cost was also high. The Su-Kam team therefore hired 5 Service Engineers locally & provided them with proper training. Now, these trained personnel are responsible for maintenance of these sites. Local insurgency - All the sites were situated at hilly and remote locations surrounded by local goons and trouble makers who disturbed the incoming traffic by demanding money from travellers. Many locations in Manipur & Assam remained closed for at least 2 days a week due to ethnic riots, local & political issues making it difficult to move from one site to another. Notes to EditorAbout Su-Kam Power Systems Ltd. Su-Kam is India's most admired power solutions provider, with growing presence across India and over 70 countries worldwide covering the major expanse of

Africa,

Middle East Regions, South East Asia, Latin America etc. A truly knowledge driven company, with innovation at heart, Su-Kam develops intelligent power back-up solutions, engineered to be energy efficient and thus reduce the user's carbon footprint. Headquartered in Gurgaon and with 6 state-of-the art manufacturing facilities certified under OHSAS - 18001, this ISO 9001 and ISO 14001 certified company leads the market with its product innovation, design sensibility and a large and widespread sales distribution network. The company has over 30000 dealerships in India and 1200 dealers worldwide. Su-Kam is the only power back-up company to be recognized for its R & D by the Department of Science and Technology, New Delhi. The company is credited for filing the highest number of patents in the Industry with an average of 2 patents every month. The company has received several prestigious awards like Asia's Most Promising Brand Award 2013, Market Leadership Award in A

frica

2013, Asian Leadership Award 2013, Business Superbrand 2008, Selected Superbrand 2009, Powerbrand India 2010, National Award for quality Product from Government of India etc. Working further towards a cleaner, greener planet, Su-Kam is branching out towards eco-friendly inexhaustible energy solutions like solar power. For more information, please visit www.su-kam.comRead more on IndiaPRwire.com

Show more