by Shannon Cay
HARRISON, Ark. – The city of Harrison is helping people get rid of the fallen leaves this winter season.
According to a press release from the city, crews are asking people to rake fallen leaves to the curb, so the city’s vacuum truck can easily suck up the tree debris, over the next month.
Public Works Director Wade Philips says folks can also bag leafs, however, only bio-degradable bags will be accepted by the city. He says this is because the leaf filled bags will eventually be turned into mulch. If you want your bagged leafs picked up call 741-3434 .
Philips adds, the Vaccum truck is scheduled to hit several different areas of Harrison within the next month or so.
THE FOLLOWING IS THE SCHEDULE FOR THE VACCUM TRUCK:
WARD 2 – NOVEMBER 30TH TO DECEMBER 4TH
SAMPLE STREETS
SOUTH MAPLE – PROSPECT TO NEWMAN
NEWMAN – SOUTH MAPLE TO OAK
CENTRAL – CHERRY TO PARK AVE.
NICHOLSON – PINE TO OAK
SOUTH AVE. – PINE TO LIBERTY
COLLEGE – PINE TO TAMARIND
ROGERS – PINE TO TAMARIND
ARBOR DRIVE – CAPPS ROAD TO SURREY LANE
BERRY – VISTA DRIVE TO KAY
BEVERLY DRIVE – OAK TO PINE
CIRCLE DRIVE
WARD 3 – DECEMBER 7TH TO DECEMBER 11th
SAMPLE STREETS
WALNUT – SOUTH MAIN TO SYCAMORE TO SOUTH AVE.
SOUTH AVE. – WALNUT TO UNION ROAD
CHESTNUT – SOUTH AVE. TO NEWMAN
ASH STREET – SOUTH AVE. TO SCHOOL
WOODLAND DRIVE – SOUTH AVE. TO SOUTH AVE. (CIRCLE)
UNION ROAD – SOUTH MAIN TO DAVIS
DAVIS – UNION ROAD TO TROY
TROY – DAVIS TO MAIN
MAE AVE. – TROY TO VELMA
BROWN – HIGHWY 62/65 TO RATHEL
ROBERTA – RATHEL TO HIGHWAY 62/65 SOUTH
COY – HIGHWAY 62/65 TO FREESTONE
FREESTONE – ALBERTA & PEACH
WARD 1 – DECEMBER 14TH – DECEMBER 18TH
SAMPLE STREETS
WEST BOWER – WALNUT TO DEAD END
SHERMAN – MAIN ST. TO NORTH LIBERTY
SPRUCE – MAIN STREET TO SHERMAN
ORENDORFF TO NURSING HOMES
INDUSTRIAL PARK ROAD, NORTH – INTERCHANGE TO DEAD END
GOBLIN DRIVE – INDUSTRIAL PARK ROAD TO HIGHWAY 62/65 NORTH
FORWARD DRIVE – INDUSTRIAL PARK ROAD TO HIGHWAY 62/65 NORTH
HESTER DRIVE – HIGHWAY62/65 NORTH TO AIRPORT ROAD
NORTH MAPLE – CENTRAL TO SHERMAN
HOLT – NORTH MAPLE TO RIDGEMONT ADDITION
WARD 4 – DECEMBER 21ST – 23RD and DECEMBER 28TH – 31ST
SAMPLE STREETS
COTTONWOOD ROAD – HIGHWAY 43 TO ANDREWS
INCLUDING SHERWOOD ESTATES
WATTS ADDITION – COTTONWOOD ROAD
CHESTNUT – PROSPECT TO MAPLEWOOD CEMETERY
WOLFE AVE. – HIGHWAY 7 NORTH TO HIGHWAY 62/65 BYPASS
WASTEWATER TREATMENT PLANT
KIMES ADDITION
SHERMAN – CHESTNUT TO HIGHWAY 7 NORTH
PROSPECT – HIGHWAY 7 NORTH TO CITY MAINTENANCE BUILDING
BRITTNEY LANE
MCCLELLAN DRIVE
ROBINSON – SHERMAN TO PROSPECT
SHAMROCK – HIGHWAY 7 NORTH TO DEAD END
IF THE WEATHER PREVENTS THE PICKUP OF LEAVES, WE WILL RETURN TO LEAF PICKUP AS SOON AS WEATHER ALLOWS