NBN indicates that 75 areas will move to construction phase this month, including the first areas to start HFC construction.
15 April 2016: The company responsible for building the National Broadband Network, nbn, has released its monthly rollout map update revealing the latest areas to go into construction.
We've crunched the numbers and found that a total of 75 new brownfields (built up areas) have entered into the build phase around Australia this month - including the first 11 HFC areas to go into construction. The NBN was also switched on in 26 rollout areas and 49 fixed-wireless towers to service outer metropolitan fringes since this time last month. You can read more about the different NBN technologies in our detailed guide.
Just like last month, both the Australian Capital Territory and Northern Territory miss out on new rollout areas.
To find out if you're in the rollout plan and to see when you can expect services to become avaliable, search for your address on finder.com.au's NBN tracker and subscribe to get notified as soon as your address is active.
More info
The monthly NBN map update provides a list of rollout areas where construction work had commenced the previous month (in this case, March 2016). If you've seen NBN construction start in your area, it may take up to a month before it's announced publicly.
In the meantime, you can subscribe to our rollout updates to get notified as soon as your area becomes ready for service.
NSW
VIC
QLD
SA
WA
TAS
New Developments
Brownfields (Fibre) Rollout Update
Now active in these areas
NBN switched on 3 fibre rollout areas in built-up areas (brownfields) around NSW last month.
Rollout Region
Locality
April 2016 Status
March 2016 Status
2BLK-12
Lalor Park, Kings Park
Active
Build Commenced
2MAI-07
Metford
Active
Build Commenced
2MYF-02
Mayfield East, Mayfield West, Mayfield
Active
Build Commenced
Brownfields (Multi-Technology Mix) Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 14 brownfields regions in NSW. These areas will primarily use Fibre to the Node technology, with some limited use of Fibre to the Premises and Fibre to the Basement technologies.
Rollout Region
Locality
April 2016 Status
March 2016 Status
2ALB-02
East Albury
Build Commenced
N/A (new in April 2016)
2AVA-03
Avalon, Bilgola
Build Commenced
N/A (new in April 2016)
2BUP-01
Buff Point, San Remo
Build Commenced
N/A (new in April 2016)
2KEL-03
Stanhope Gardens, The Ponds, Kellyville Ridge
Build Commenced
Build Preparation
2NAA-02
Lisarow, Ourimbah
Build Commenced
N/A (new in April 2016)
2NLB-04
Salamander Bay, Corlette
Build Commenced
Build Preparation
2NLB-05
Soldiers Point, Salamander Bay
Build Commenced
Build Preparation
2NRN-03
Harrington Park, Narellan Vale, Smeaton Grange
Build Commenced
N/A (new in April 2016)
2NRN-05
Elderslie, Narellan, Narellan Vale
Build Commenced
N/A (new in April 2016)
2PKE-05
Berkeley, Lake Heights
Build Commenced
N/A (new in April 2016)
2PKE-07
Unanderra, Farmborough Heights
Build Commenced
Build Preparation
2SHH-04
Flinders, Blackbutt
Build Commenced
Build Preparation
2WAG-04
Kooringal, Mount Austin, Turvey Park
Build Commenced
N/A (new in April 2016)
2WAG-10
Glenfield Park, Tolland
Build Commenced
N/A (new in April 2016)
Now active in these areas
NBN switched on 1 multi-technology rollout areas in built-up areas (brownfields) around NSW last month. These areas will primarily use Fibre to the Node technology, with some limited use of Fibre to the Premises and Fibre to the Basement technologies.
Rollout Region
Locality
April 2016 Status
March 2016 Status
2TGL-02
Terrigal, Wamberal, North Avoca
Active
Build Commenced
Fixed Wireless Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 8 fixed wireless towers to service outer metropolitan fringes in NSW.
Rollout Region
Locality
April 2016 Status
March 2016 Status
2KMS-51-15-KEMS
Kempsey
Build Commenced
N/A (new in April 2016)
2MAI-51-01-GRES
Gresford South
Build Commenced
N/A (new in April 2016)
2MAI-51-04-DUCR
Duns Creek
Build Commenced
N/A (new in April 2016)
2SIN-51-03-ELDE
Elderslie
Build Commenced
N/A (new in April 2016)
2SIN-51-07-ROTH
Rothbury
Build Commenced
N/A (new in April 2016)
2SIN-51-11-WINE
Winders Hill
Build Commenced
N/A (new in April 2016)
2TUM-51-02-TUMU
Tumut
Build Commenced
N/A (new in April 2016)
2TUM-51-03-GDGD
Gundagai
Build Commenced
N/A (new in April 2016)
Now active in these areas
NBN switched on 12 fixed wireless rollout areas last month to service outer metropolitan fringes in NSW.
Rollout Region
Locality
April 2016 Status
March 2016 Status
2BMG-51-03-COBA
Cobargo
Active
Build Commenced
2BMG-51-04-COOG
Coolagolite
Active
Build Commenced
2BOM-51-01-BOMB
Bombala
Active
Build Commenced
2BTH-51-04-EGLI
Eglinton
Active
Build Commenced
2COM-51-02-DAIR
Dairymans
Active
Build Commenced
2COM-51-03-GYGE
Gygederick Hill
Active
Build Commenced
2COM-51-04-MTGL
Mt Gladstone
Active
Build Commenced
2COM-51-06-NIMM
Nimmitabel
Active
Build Commenced
2COM-51-08-BUNN
Bunyan
Active
Build Commenced
2FNL-51-01-OAKL
Oaklands
Active
Build Commenced
2FNL-51-04-JERI
Jerilderie
Active
Build Commenced
2WGL-51-03-BARC
Barcoongere
Active
Build Commenced
Brownfields (Fibre) Rollout Update
Now active in these areas
NBN switched on 2 fibre rollout areas in built-up areas (brownfields) around VIC last month.
Rollout Region
Locality
April 2016 Status
March 2016 Status
3BRA-10
Mount Helen, Buninyong
Active
Build Commenced
3KAL-07
Langwarrin, Cranbourne South
Active
Build Commenced
Brownfields (Multi-Technology Mix) Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 16 brownfields regions in VIC. These areas will primarily use Fibre to the Node technology, with some limited use of Fibre to the Premises and Fibre to the Basement technologies.
Rollout Region
Locality
April 2016 Status
March 2016 Status
3COL-01
Colac
Build Commenced
N/A (new in April 2016)
3KGP-10
Burnside Heights, Taylors Hill
Build Commenced
N/A (new in April 2016)
3KIL-01
Kilmore
Build Commenced
N/A (new in April 2016)
3LOR-20
Lorne
Build Commenced
N/A (new in April 2016)
3MOR-02
Mornington
Build Commenced
Build Preparation
3MOR-05
Mornington
Build Commenced
Build Preparation
3OCG-06
Point Lonsdale, Queenscliff
Build Commenced
N/A (new in April 2016)
3RMS-01
Lancefield, Romsey
Build Commenced
N/A (new in April 2016)
3SUN-01
Sunbury
Build Commenced
N/A (new in April 2016)
3SUN-04
Sunbury
Build Commenced
N/A (new in April 2016)
3TAG-03
Traralgon, Traralgon East
Build Commenced
N/A (new in April 2016)
3TAG-04
Traralgon
Build Commenced
N/A (new in April 2016)
3WBO-01
Warrnambool
Build Commenced
N/A (new in April 2016)
3WBO-02
Warrnambool
Build Commenced
N/A (new in April 2016)
3WDG-02
Bandiana, Baranduda, Wodonga
Build Commenced
N/A (new in April 2016)
3WDG-05
Wodonga
Build Commenced
N/A (new in April 2016)
Fixed Wireless Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 9 fixed wireless towers to service outer metropolitan fringes in VIC.
Rollout Region
Locality
April 2016 Status
March 2016 Status
3BAI-51-12-NICO
Nicholson East
Build Commenced
N/A (new in April 2016)
3BAI-51-13-NUNU
Nungurner
Build Commenced
N/A (new in April 2016)
3BAI-51-19-LAKU
Lake Bunga
Build Commenced
N/A (new in April 2016)
3COL-51-03-BEEA
Beeac
Build Commenced
N/A (new in April 2016)
3EAH-51-01-BRID
Bridgewater on Loddon
Build Commenced
N/A (new in April 2016)
3EAH-51-04-MARO
Marong
Build Commenced
N/A (new in April 2016)
3EAH-51-05-RAYW
Raywood
Build Commenced
N/A (new in April 2016)
3REF-51-02-CARO
Cardross
Build Commenced
N/A (new in April 2016)
3WAN-51-04-ELDO
Eldorado
Build Commenced
N/A (new in April 2016)
Now active in these areas
NBN switched on 15 fixed wireless rollout areas last month to service outer metropolitan fringes in VIC.
Rollout Region
Locality
April 2016 Status
March 2016 Status
3ECH-51-01-BAMA
Bamawm Extension
Active
Build Commenced
3ECH-51-02-ECHU
Echuca South
Active
Build Commenced
3ECH-51-03-ECHC
Echuca Village
Active
Build Commenced
3ECH-51-04-STRL
Strathallan North
Active
Build Commenced
3ECH-51-05-WHAR
Wharparilla
Active
Build Commenced
3ECH-51-06-WHAP
Wharparilla North
Active
Build Commenced
3HMO-51-12-PENS
Penshurst
Active
Build Commenced
3KER-51-02-KERA
Kerang
Active
Build Commenced
3KER-51-04-KORO
Koroop
Active
Build Commenced
3MFL-51-04-HQIT
Howqua Inlet
Active
Build Commenced
3NMK-51-01-INVG
Invergordon
Active
Build Commenced
3NMK-51-02-KATM
Katamatite
Active
Build Commenced
3NMK-51-06-WUNG
Wunghnu
Active
Build Commenced
3ORB-51-13-MEAS
Marlo East
Active
Build Commenced
3SAL-51-15-COOU
Coongulla
Active
Build Commenced
Brownfields (Fibre) Rollout Update
Now active in these areas
NBN switched on 3 fibre rollout areas in built-up areas (brownfields) around QLD last month.
Rollout Region
Locality
April 2016 Status
March 2016 Status
4GDN-02
Goodna, Bellbird Park
Active
Build Commenced
4MKY-07
Racecourse, West Mackay, Ooralea
Active
Build Commenced
4TNS-01
Townsville City
Active
Build Commenced
Brownfields (Multi-Technology Mix) Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 19 brownfields regions in QLD. These areas will primarily use Fibre to the Node technology (or using HFC where indicated), with some limited use of Fibre to the Premises and Fibre to the Basement technologies.
Rollout Region
Locality
April 2016 Status
March 2016 Status
4BDS-01
Beaudesert
Build Commenced
N/A (new in April 2016)
4BUD-05
Palmwoods
Build Commenced
N/A (new in April 2016)
4FRV-02
Frenchville, Norman Gardens
Build Commenced
N/A (new in April 2016)
4HYP-01
Hay Point
Build Commenced
N/A (new in April 2016)
4IGH-01
Ingham
Build Commenced
N/A (new in April 2016)
4MYD-03
Maroochydore
Build Commenced
N/A (new in April 2016)
4NEW-02
Rockville, Wilsonton, Wilsonton Heights
Build Commenced
N/A (new in April 2016)
4NEW-06
Cotswold Hills, Gowrie Junction, Torrington, Wilsonton
Build Commenced
N/A (new in April 2016)
4RDC-65 (HFC)
Clontarf
Build Commenced
N/A (new in April 2016)
4RDC-66 (HFC)
Clontarf, Kippa-Ring
Build Commenced
N/A (new in April 2016)
4RDC-67 (HFC)
Margate
Build Commenced
N/A (new in April 2016)
4RDC-68 (HFC)
Clontarf, Kippa-Ring, Margate
Build Commenced
N/A (new in April 2016)
4RDC-69 (HFC)
Redcliffe
Build Commenced
N/A (new in April 2016)
4RDC-71 (HFC)
Margate, Woody Point
Build Commenced
N/A (new in April 2016)
4RDC-72 (HFC)
Kippa-Ring, Redcliffe
Build Commenced
N/A (new in April 2016)
4RDC-73 (HFC)
Scarborough
Build Commenced
N/A (new in April 2016)
4SAR-01
Sarina
Build Commenced
N/A (new in April 2016)
4SFT-01
Seaforth
Build Commenced
N/A (new in April 2016)
4SHF-02
Trinity Beach
Build Commenced
Build Preparation
Now active in these areas
NBN switched on 14 multi-technology rollout areas in built-up areas (brownfields) around QLD last month. These areas will primarily use Fibre to the Node technology, with some limited use of Fibre to the Premises and Fibre to the Basement technologies.
Rollout Region
Locality
April 2016 Status
March 2016 Status
4BRI-01
Woorim, Bongaree
Active
Build Commenced
4BRI-02
Bongaree
Active
Build Commenced
4BRI-03
Bellara, Banksia Beach
Active
Build Commenced
4BRI-04
Welsby, White Patch, Banksia Beach
Active
Build Commenced
4GYM-01
Gympie
Active
Build Commenced
4GYM-02
Southside, Jones Hill
Active
Build Commenced
4GYM-03
Monkland, Gympie
Active
Build Commenced
4GYM-04
Gympie, Victory Heights, Araluen
Active
Build Commenced
4NIN-01
Ningi, Sandstone Point, Godwin Beach
Active
Build Commenced
4WRN-01
Brendale
Active
Build Commenced
4WRN-04
Lawnton
Active
Build Commenced
4WRN-05
Joyner, Lawnton, Warner, Bray Park
Active
Build Commenced
4WRN-06
Joyner, Warner, Cashmere
Active
Build Commenced
4WRN-07
Warner, Brendale
Active
Build Commenced
Fixed Wireless Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 15 fixed wireless towers to service outer metropolitan fringes in QLD.
Rollout Region
Locality
April 2016 Status
March 2016 Status
4AGW-51-01-AGNE
Agnes Water South
Build Commenced
N/A (new in April 2016)
4AGW-51-02-AGNS
Agnes Water West
Build Commenced
N/A (new in April 2016)
4BBE-51-23-KENG
Kensington
Build Commenced
N/A (new in April 2016)
4BLB-51-05-TARM
Taromeo South
Build Commenced
N/A (new in April 2016)
4CLP-51-01-ELIA
Elizabeth Peak
Build Commenced
N/A (new in April 2016)
4GYM-51-05-CHAT
Chatsworth East
Build Commenced
N/A (new in April 2016)
4KLC-51-01-KILO
Kilcoy
Build Commenced
N/A (new in April 2016)
4KRO-51-11-BELE
Bell
Build Commenced
N/A (new in April 2016)
4MAL-51-12-WITA
Witta North
Build Commenced
N/A (new in April 2016)
4MLS-51-05-GUAN
Guanaba
Build Commenced
N/A (new in April 2016)
4MRN-51-12-MIRA
Mirani
Build Commenced
N/A (new in April 2016)
4NAN-51-07-TARO
Tarong North
Build Commenced
N/A (new in April 2016)
4NBR-51-06-NAMW
Nambour West
Build Commenced
N/A (new in April 2016)
4PPN-51-09-PRPS
Proserpine
Build Commenced
N/A (new in April 2016)
4SAR-51-14-STLW
St Lawrence
Build Commenced
N/A (new in April 2016)
Now active in these areas
NBN switched on 18 fixed wireless rollout areas last month to service outer metropolitan fringes in QLD.
Rollout Region
Locality
April 2016 Status
March 2016 Status
4ATH-51-07-MALA
Malanda
Active
Build Commenced
4BIL-51-06-TEOO
Theodore
Active
Build Commenced
4BLB-51-03-MOOE
Moore
Active
Build Commenced
4GYM-51-01-AMAM
Amamoor
Active
Build Commenced
4GYM-51-18-THPM
The Palms
Active
Build Commenced
4GYM-51-30-IMBI
Imbil
Active
Build Commenced
4GYM-51-31-KAND
Kandanga
Active
Build Commenced
4HWR-51-03-BUXV
Buxtonville
Active
Build Commenced
4INN-51-14-EARA
El Arish
Active
Build Commenced
4INN-51-15-KBSR
Kurrimine Beach South
Active
Build Commenced
4INN-51-17-MMTN
Mount Myrtle
Active
Build Commenced
4INN-51-18-SILK
Silkwood
Active
Build Commenced
4LAM-51-12-TANB
Tanby
Active
Build Commenced
4MBO-51-06-MUNG
Mungar
Active
Build Commenced
4MLS-51-05-GUAN
Guanaba
Active
Build Commenced
4MUR-51-08-KKVK
Kilkivan
Active
Build Commenced
4RHO-51-02-MILS
Millstream
Active
Build Commenced
4RHO-51-03-MOUG
Mount Garnett
Active
Build Commenced
Brownfields (Multi-Technology Mix) Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 9 brownfields regions in SA. These areas will primarily use Fibre to the Node technology (or using HFC where indicated), with some limited use of Fibre to the Premises and Fibre to the Basement technologies.
Rollout Region
Locality
April 2016 Status
March 2016 Status
5GPC-06
Ingle Farm, Pooraka, Walkley Heights
Build Commenced
N/A (new in April 2016)
5GPC-07
Mawson Lakes
Build Commenced
N/A (new in April 2016)
5GUG-61 (HFC)
Cumberland Park, Daw Park
Build Commenced
N/A (new in April 2016)
5JAM-01
Jamestown
Build Commenced
N/A (new in April 2016)
5KET-01
Keith
Build Commenced
N/A (new in April 2016)
5KGS-01
Kingston SE, Pinks Beach
Build Commenced
N/A (new in April 2016)
5MGI-01
Meningie
Build Commenced
N/A (new in April 2016)
5REL-07
Reynella East, Woodcroft, Happy Valley
Build Commenced
Build Preparation
5STI-01
Aldgate, Crafers, Heathfield, Stirling
Build Commenced
N/A (new in April 2016)
Fixed Wireless Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 5 fixed wireless towers to service outer metropolitan fringes in SA.
Rollout Region
Locality
April 2016 Status
March 2016 Status
5NUR-51-03-GREE
Greenock
Build Commenced
N/A (new in April 2016)
5PTL-51-09-WINH
Winter Hill
Build Commenced
N/A (new in April 2016)
5YOW-51-01-COOB
Coobowie
Build Commenced
N/A (new in April 2016)
5YOW-51-09-YORK
Yorketown
Build Commenced
N/A (new in April 2016)
5YOW-51-14-CURM
Curramulka
Build Commenced
N/A (new in April 2016)
Now active in these areas
NBN switched on 2 fixed wireless rollout areas last month to service outer metropolitan fringes in SA.
Rollout Region
Locality
April 2016 Status
March 2016 Status
5PTL-51-01-COFI
Coffin Bay
Active
Build Commenced
5PTL-51-07-WANA
Wangary
Active
Build Commenced
Brownfields (Fibre) Rollout Update
Now active in these areas
NBN switched on 2 fibre rollout areas in built-up areas (brownfields) around WA last month.
Rollout Region
Locality
April 2016 Status
March 2016 Status
6MDR-07
Dudley Park, Coodanup
Active
Build Commenced
6SPT-08
Manning, Salter Point, Waterford, Karawara
Active
Build Commenced
Brownfields (Multi-Technology Mix) Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 13 brownfields regions in WA. These areas will primarily use Fibre to the Node technology (or using HFC where indicated), with some limited use of Fibre to the Premises and Fibre to the Basement technologies.
Rollout Region
Locality
April 2016 Status
March 2016 Status
6ARM-02
Byford
Build Commenced
N/A (new in April 2016)
6ARM-12
Harrisdale, Piara Waters
Build Commenced
N/A (new in April 2016)
6BNB-03
East Bunbury, Carey Park
Build Commenced
Build Preparation
6BUS-02
Busselton, Geographe
Build Commenced
N/A (new in April 2016)
6BUS-03
Busselton, West Busselton
Build Commenced
N/A (new in April 2016)
6COI-02
Allanson, Collie
Build Commenced
N/A (new in April 2016)
6JDL-60 (HFC)
Connolly,Ocean Reef
Build Commenced
N/A (new in April 2016)
6JDL-62 (HFC)
Connolly, Ocean Reef
Build Commenced
N/A (new in April 2016)
6QIN-02
Jindalee, Quinns Rocks
Build Commenced
N/A (new in April 2016)
6RKH-02
East Rockingham, Rockingham
Build Commenced
N/A (new in April 2016)
6RKH-03
Cooloongup, Hillman, Rockingham
Build Commenced
N/A (new in April 2016)
6RKH-06
Safety Bay, Waikiki
Build Commenced
N/A (new in April 2016)
6RKH-08
Rockingham
Build Commenced
N/A (new in April 2016)
Fixed Wireless Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 8 fixed wireless towers to service outer metropolitan fringes in WA.
Rollout Region
Locality
April 2016 Status
March 2016 Status
6BRJ-51-02-BRUN
Brunswick
Build Commenced
N/A (new in April 2016)
6PNJ-51-02-SOUT
South Yunderup
Build Commenced
N/A (new in April 2016)
6PNJ-51-03-PINJ
Pinjarra
Build Commenced
N/A (new in April 2016)
6PNJ-51-07-BARP
Barragup
Build Commenced
N/A (new in April 2016)
6PRE-51-03-MOUN
Mount John
Build Commenced
N/A (new in April 2016)
6TOO-51-02-CODL
Coondle
Build Commenced
N/A (new in April 2016)
6TOO-51-05-TODS
Toodyay South
Build Commenced
N/A (new in April 2016)
6TOO-51-07-GNGN
Gingin
Build Commenced
N/A (new in April 2016)
Brownfields (Fibre) Rollout Update
Now active in these areas
NBN switched on 1 fibre rollout areas in built-up areas (brownfields) around TAS last month.
Rollout Region
Locality
April 2016 Status
March 2016 Status
7SHL-05
St Leonards
Active
Build Commenced
Brownfields (Multi-Technology Mix) Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 4 brownfields regions in TAS. These areas will primarily use Fibre to the Node technology, with some limited use of Fibre to the Premises and Fibre to the Basement technologies.
Rollout Region
Locality
April 2016 Status
March 2016 Status
7DER-03
Miandetta, Quoiba, Spreyton, Stony Rise, Tugrah, Aberdeen
Build Commenced
Build Preparation
7HOB-12
South Hobart, Wellington Park, Fern Tree
Build Commenced
Build Preparation
7HUL-01
Franklin, Huonville, Ranelagh
Build Commenced
N/A (new in April 2016)
7NWT-02
Berriedale, Chigwell, Claremont
Build Commenced
N/A (new in April 2016)
Fixed Wireless Rollout Update
Build has now commenced in these areas
Construction work has commenced for an additional 7 fixed wireless towers to service outer metropolitan fringes in TAS.
Rollout Region
Locality
April 2016 Status
March 2016 Status
7CLT-51-11-OATL
Oatlands
Build Commenced
N/A (new in April 2016)
7CLT-51-12-PART
Parattah
Build Commenced
N/A (new in April 2016)
7CYE-51-08-GEEV
Geeveston
Build Commenced
N/A (new in April 2016)
7CYE-51-12-LUNE
Lune River
Build Commenced
N/A (new in April 2016)
7DSF-51-10-MURD
Murdunna East
Build Commenced
N/A (new in April 2016)
7HUL-51-12-CHIM
Chimney Pot
Build Commenced
N/A (new in April 2016)
7RAO-51-08-ERRI
Erriba
Build Commenced
N/A (new in April 2016)
Now active in these areas
NBN switched on 2 fixed wireless rollout areas last month to service outer metropolitan fringes in TAS.
Rollout Region
Locality
April 2016 Status
March 2016 Status
7NOL-51-12-MOUR
Mount Rivulet
Active
Build Commenced
7SWA-51-02-CBEE
Coles Bay East
Active
Build Commenced
New Developments (Fibre) Rollout Update
Build preparation has commenced in these new developments
Rollout Region
Locality
April 2016 Status
March 2016 Status
AYCA-18U14O
Jaques Apartments (Stage 2)
Build Preparation
N/A (new in April 2016)
AYCA-1D309I
Moncrieff Residential Estate (Stage 3 (West))
Build Preparation
N/A (new in April 2016)
AYCA-1GXOQF
Hepburn (Magnolia) Apartments (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1H13L5
Elements Estate (Stage 2)
Build Preparation
N/A (new in April 2016)
AYCA-1HOLRT
Ballina Heights (Stage 8a)
Build Preparation
N/A (new in April 2016)
AYCA-1IDA1V
RIX RD (Stage 6)
Build Preparation
N/A (new in April 2016)
AYCA-1II50T
Mason Point (Stage 2A)
Build Preparation
N/A (new in April 2016)
AYCA-1IMEN1
20 Bush Boulevard (Stage 2)
Build Preparation
N/A (new in April 2016)
AYCA-1J1R9S
Northlakes Estate (Stage 45)
Build Preparation
N/A (new in April 2016)
AYCA-1JKNHH
Lot 112 Schofields Rd Schofields (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1JUBGD
EVE (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1KKXKB
Lucent (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1L4KCF
Wentworth Point Marinas Block G (Stage 3)
Build Preparation
N/A (new in April 2016)
AYCA-1LXBAR
Skyring Apartments (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1MIEQM
Moncrieff Residential Estate (Stage 2B (East))
Build Preparation
N/A (new in April 2016)
AYCA-1NDODB
Lampada (Stage 8)
Build Preparation
N/A (new in April 2016)
AYCA-1NZK6Q
61-67 Caboolture River Rd (Stage 4)
Build Preparation
N/A (new in April 2016)
AYCA-1NZKFI
61-67 Caboolture River Rd (Stage 5)
Build Preparation
N/A (new in April 2016)
AYCA-1O2U12
1 - 5 Weston Street, Rosehill (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1O3I19
Pentridge Coburg (Stage Pentridge 7 - West - 1)
Build Preparation
N/A (new in April 2016)
AYCA-1O7TFT
Riverstone Crossing (Stage 13A)
Build Preparation
N/A (new in April 2016)
AYCA-1O8ZKV
Marsden Heights (Stage 6)
Build Preparation
N/A (new in April 2016)
AYCA-1P5C2I
Katandra Rise Estate (Stage 5)
Build Preparation
N/A (new in April 2016)
AYCA-1QFWWC
29&31 Hezlett Road (Stage 1, 2, 3, 4)
Build Preparation
N/A (new in April 2016)
AYCA-1QG17L
33&35 Hezlett Road (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1QKQN7
Spring Farm (Stage P305)
Build Preparation
N/A (new in April 2016)
AYCA-1QVCZX
209 Bay Street (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1RX8BR
ARENA (Stage 3)
Build Preparation
N/A (new in April 2016)
AYCA-1S8W9Y
Adresse (Stage 5)
Build Preparation
N/A (new in April 2016)
AYCA-1SC3UK
ARV - The Ponds (Stage 3&4)
Build Preparation
N/A (new in April 2016)
AYCA-1SGVOG
Jinglers Creek Estate (Stage 3)
Build Preparation
N/A (new in April 2016)
AYCA-1SXQ4Z
Lot 10,50 & 700 Ocean Reef Gnangara (Stage 4B Phase 2)
Build Preparation
N/A (new in April 2016)
AYCA-1TQ2MG
Tower Rise Estate (Stage 4)
Build Preparation
N/A (new in April 2016)
AYCA-1TXF6J
COASTAL PARK ESTATE (Stage 3)
Build Preparation
N/A (new in April 2016)
AYCA-1U0N4F
Camberwarra Primary School Redevelopment (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1VD93W
Riverbank (Stage 3B)
Build Preparation
N/A (new in April 2016)
AYCA-1W24PL
Rockbank North (Woodlea) (Stage 4)
Build Preparation
N/A (new in April 2016)
AYCA-1WA1SS
Manor Lakes (Stage 132)
Build Preparation
N/A (new in April 2016)
AYCA-1WAY3D
Allura Estate (Stage 40)
Build Preparation
N/A (new in April 2016)
AYCA-1WB0YC
Allura Estate (Stage 41)
Build Preparation
N/A (new in April 2016)
AYCA-1WCWAU
Ormeau Ridge (Stage 23)
Build Preparation
N/A (new in April 2016)
AYCA-1WDK30
Highland Reserve - L2097 Augustus Dr (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1WVIL6
Broughton Street - Moss Vale (Stage 3)
Build Preparation
N/A (new in April 2016)
AYCA-1X178Z
565 Hume (Stage 2)
Build Preparation
N/A (new in April 2016)
AYCA-1X4PVA
Jubilee (Precinct 1) (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1XA8LF
26 Park Street, Riverstone (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1XD1CL
West Baldivis (Stage 3)
Build Preparation
N/A (new in April 2016)
AYCA-1XIC4V
Timbertop 8-13 (Stage 10)
Build Preparation
N/A (new in April 2016)
AYCA-1XJK6S
46 Ashbourne Road Community Development (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1XZNCT
Timbertop 8-13 (Stage 9)
Build Preparation
N/A (new in April 2016)
AYCA-1Y0UYI
Warralily Coast (Stage 77)
Build Preparation
N/A (new in April 2016)
AYCA-1YQTD5
Elements Estate (Stage 4)
Build Preparation
N/A (new in April 2016)
AYCA-1Z9RA4
2/28 Lawson - 2611 Developments Pty Ltd (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-1ZLNCY
Livingston Development (Stage 13)
Build Preparation
N/A (new in April 2016)
AYCA-1ZNFWN
Oakmont (Stage 2)
Build Preparation
N/A (new in April 2016)
AYCA-2010S4
Rangeview Estate (Stage 8&9)
Build Preparation
N/A (new in April 2016)
AYCA-201KPV
Elements Estate (Stage 3)
Build Preparation
N/A (new in April 2016)
AYCA-202OSS
Mulgoa Rise (Stage 5)
Build Preparation
N/A (new in April 2016)
AYCA-20FGQ3
The Heartlands (Stage 15)
Build Preparation
N/A (new in April 2016)
AYCA-20TBX3
South Beach Farm Estate (Stage 2)
Build Preparation
N/A (new in April 2016)
AYCA-216WYH
80-84 Kildare Road, Blacktown (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-21ANQJ
alban gardens (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-21RDPV
Charlemont Rise (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-21U2MF
Tumbi Heights Estate (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-227I3Z
Livingston Development (Stage 12)
Build Preparation
N/A (new in April 2016)
AYCA-22MJDX
Stockdale Fields Estate (v1) (Stage 6)
Build Preparation
N/A (new in April 2016)
AYCA-22OKF4
50 Pine Road Richlands (Stage 3)
Build Preparation
N/A (new in April 2016)
AYCA-22ON4N
50 Pine Road Richlands (Stage 2)
Build Preparation
N/A (new in April 2016)
AYCA-22YN6S
Lot 9007 Shallcross Street Yangebup (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-231YWS
Springridge Estate (Stage 4E)
Build Preparation
N/A (new in April 2016)
AYCA-234FJ0
Rockbank North (Woodlea) (Stage 5)
Build Preparation
N/A (new in April 2016)
AYCA-237Q8T
90 Harvest Home Road, Wollert (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-23E4GJ
Lot 45 Wright Road Piara Waters (Stage 2B)
Build Preparation
N/A (new in April 2016)
AYCA-23E54B
HUB (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-23TSZU
Jubilee (Precinct 1) (Stage 5)
Build Preparation
N/A (new in April 2016)
AYCA-245Z7T
Sovereign Hills (Stage Sterling Green 1a)
Build Preparation
N/A (new in April 2016)
AYCA-24BI7H
Blackrock Development (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-24QE71
Ward 20 (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-24UHVI
Woods Road Developments Pty Ltd (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-24WWS1
The Village at Wellard (Stage VCS4)
Build Preparation
N/A (new in April 2016)
AYCA-24XIMK
Quarters (Stage 11)
Build Preparation
N/A (new in April 2016)
AYCA-24XZAL
Lot 9006 Shallcross Street, Yangebup (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-250EOR
Jubilee (Precinct 1) (Stage 6)
Build Preparation
N/A (new in April 2016)
AYCA-250T5O
Lot 107 Barfield Road, Hammond Park (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-256LSL
Dwyer Street, Kalkallo (Stage 2)
Build Preparation
N/A (new in April 2016)
AYCA-263C5A
82-88 Schofields Rd (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-26A3CB
Lot 32 Sciano Avenue, Success (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-26I6MN
Mernda Villages (Stage 63)
Build Preparation
N/A (new in April 2016)
AYCA-28XC74
Sovereign Pocket (The Outlook) (Stage 5B)
Build Preparation
N/A (new in April 2016)
AYCA-2975T1
Flamingo Park Estate (Stage 3 and 4)
Build Preparation
N/A (new in April 2016)
AYCA-2977MS
Citrine Road (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-29BQNX
Strzelecki Views Estate (Stage 3)
Build Preparation
N/A (new in April 2016)
AYCA-29PCA6
Dunsborough Lakes (Stage 1B)
Build Preparation
N/A (new in April 2016)
AYCA-2BCOJN
Ashlar (Stage 42)
Build Preparation
N/A (new in April 2016)
AYCA-2BE2VV
Daintree Estate (Stage 5.1)
Build Preparation
N/A (new in April 2016)
AYCA-2BMUME
Dunsborough Lakes (Stage 18)
Build Preparation
N/A (new in April 2016)
AYCA-2CKA87
Brentford Pde Units (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-2CP0DW
Rockbank North (Woodlea) (Stage 6)
Build Preparation
N/A (new in April 2016)
AYCA-2CQX8A
TALLOWOOD (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-2CX5IN
Adresse (Stage 7)
Build Preparation
N/A (new in April 2016)
AYCA-2CZYOM
Sienna Wood (Stage Riverbend Stage 5 to 8)
Build Preparation
N/A (new in April 2016)
AYCA-2D9LX9
Lyndarum (Stage ID9)
Build Preparation
N/A (new in April 2016)
AYCA-2DLMZN
Belle Eden Estate (Stage 2E & 2F)
Build Preparation
N/A (new in April 2016)
AYCA-2DLWQO
Gardens Estate (Stage 4)
Build Preparation
N/A (new in April 2016)
AYCA-2DT1AY
Pinnacle Apartments (Stage SP2)
Build Preparation
N/A (new in April 2016)
AYCA-2EQI4S
52 Banksia Grove (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-2F34QG
Willowdale Retirement Village (Stage 3)
Build Preparation
N/A (new in April 2016)
AYCA-2F5TT1
Collier Units (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-2FYTBZ
Shorehaven Alkimos (Stage 5)
Build Preparation
N/A (new in April 2016)
AYCA-2G32NX
ALMA (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-2GIG8S
KINSELLAS ROAD WEST (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-2GRPSA
2 Barney Street, Kiama (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-2HC7EW
Yumi (Stage Franklin 1/127)
Build Preparation
N/A (new in April 2016)
AYCA-2HERI7
Kilora - 335 Grices Road (Stage 8)
Build Preparation
N/A (new in April 2016)
AYCA-2HI7EC
36 Paxford Drive, Cranbourne North, Vic (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-2HJEGK
Akora Apartments (Stage 1)
Build Preparation
N/A (new in April 2016)
AYCA-2HKCY0
<td