2016-12-29

Below is the resume that I and my cousin had worked on for 8 hrs all day today for his upcoming interview with a foreign company in Korea and we are looking for someone to proofread this resume to check there are some wrong expressions and not proper words. We are not native speakers. So it would be very helpful if some native qualified speakers check it out. Thank you!

Summary

At CJ CheilJedang Incheon Plant 1st had I worked as a production specialist and controller for raw material supply and demand for one year and eight months. Through various projects to improve the yield, quality, and inventory management level, I had contributed to improve the cost competitiveness and product quality. Based on my experience and enough understanding of manufacturing liquid product and packaging processes, I believe I can do my future QA duties without any problem.

Major Competitiveness

Communication skills based on strong interpersonal skill

Abilities to analyze statistical quality data using minitab

Cost and process analysis abilities using SAP and MES

skill to create documents using MS Office

management of quality control and inventory of cooperative firms

History of certifications

the title : 6sigma Black Belt

programs

Improvement of problem solving ability through project
implementation using 6sigma DMAIC technique

Strengthening core competence (for of about) quality data analysis and computation

Educational history

programs: ISO Internal Auditor Training Course

institution: Lloyd's Register and LRQA

programs

Establishment(building up, implementation) and operation of internal quality management system, nurturing high potential internal auditors, and enhancing auditor qualities

Understanding the requirements and responsibilities for internal audits of the ISO22000 standard.

Professional Experiences

CJ Cheiljedang * Production Specialist / Dec.2013 * Dec.2014

Main tasks

In-process production performance and Yield management

Establishment and revision of working standards and Change

point management
- Production progress with new product
- Suggestion for cost reduction and

Analyzed the operation of the process and checked the facility efficiency

Tracked performance in cost reduction

performed month-end report for product yield and cost analysis

Participated in the process of task distribution and checked the

progress

Implemented Project

Improved yield for materials for cafe (sugar mix product)
· Period : 2014.03 ~ 2014.05 (3 months)

· (total) effective amount of money : 5 million won

· details
In the sugar mix manufacturing line that was a new process, reduced the loss caused by power, installing pipelines for powder removal after setting up powder collection angle as to the characteristics of the powder. In addition, I introduced MES panel in the process, and carried out a project to prevent weighing errors and compounding errors in advance through automatic weighing of products.

Improved xylose process yield

· Period : 2014.04 ~ 2014.10(7months)
· (total) effective amount of money : 530 million won

· details
As a part of process of task distribution, I successfully carried out a project to improve the yield of xylose sugar, a premium product family. In order to solve the problems caused by viscosity, I changed the BOM and working method through cooperation with the institute, and the pattern of hopper which is the main equipment. As an award of the increase in yield of 2.5% p, I could seize the chance for participating in the annual contest in CJ(Cheiljedang )and received the third place among the 11 plants of the group. (in it)

Automation Project for Sugar mix packaging line

· Period : 2014.04 ~ 2014.11(7months)
· (total) effective amount of money : 160 million won

· details
worked on facility application project for labeling, boxing, loading and transferring product to replace four of the five employees working in the packaging process of our sugar mix product. This surprisingly had increased the daily average production from 3 tons to 6 tons through labeling, which is not only a fixed cost reduction but also a bottleneck.

CJ Cheiljedang - Supply and demand of raw materials controller

/ Jan.2015 - Jul.2015

main tasks

Daily material inventory management

MRP-based material ordering

raw material purchase order for new products based on annual average and initial production

Suggestion of cost saving idea

Month-end closing in raw materials

audit inventory of products and raw material of cooperative firms

SCM Indicator management

Delivery time evaluation of suppliers

project experience

Changed process of Xylose raw material input

· Period : 2015.02 ~ 2015.03(2months)

· (total) effective amount of money : 120 million won

· details
I shortened warehousing procedures from 7-step process to 5-step, from the port entry of imported raw material xylose to the factory. omitted the process loading and unloading the raw materials in the containers at the outsourced warehouse and switched the process to work in the Incheon 1st plant through a contract with CJ Korea Express Incheon 1 Center. This enabled us to reduce logistics and outsourcing costs.

Improvement of xylose raw material particle
· Period : 2015.0* ~ 2015.0*(2months)
· (total) effective amount of money : 80 million won

· details

Through consultation with DuPont Korea, supplier of Xylos, I made a effective difference in the particle size of the raw material. (As a result, Finally, Surprisingly) we have drastically
reduced the losses that are expected to occur in order to produce products of the size suitable for the standard in the process.

Show more