ER/MP, armed
(click to view full)
Its initial battles were fought within the Pentagon, but the US Army’s high-end UAV has made its transition to the battlefield.
The ER/MP program was part of the US Army’s reinvestment of dollars from the canceled RAH-66 Comanche helicopter program, and directly supports the Army’s Aviation Modernization Plan. The US Air Force saw this Predator derivative as a threat and tried to destroy it, but the program survived the first big “Key West” battle of the 21st century. Now, the MQ-1C “Gray Eagle” is in production as the US Army’s high-end UAV. As CENTCOM’s wars end, however, the Gray Eagle may find that staying in the fleet is as hard as getting there.
This FOCUS article offers a program history, key statistics and budget figures, and ongoing coverage of the program’s contracts and milestones.
The MQ-1C Gray Eagle, and its Band of Brothers
Predator landing
(click to view full)
With General Atomics MQ-1A/B Predators, MQ-1C Gray Eagles, and MQ-9 Reaper UAVs all headed for the skies above the conflict zone, our readers have asked us to help them tell the difference. It’s clear that all 3 share a design philosophy, but their capabilities diverge in important ways.
View from the Air
The MQ-1 Predator is 27 feet long, with a 55 foot wingspan. Its maximum gross takeoff weight is 2,300 pounds, and it can carry 625 pounds of fuel, 450 pounds of internal payload (sensors), and another 300 pounds on its wings for up to 2 AGM-114 Hellfire anti-armor missiles or equivalent loads. Its service ceiling is 25,000 feet, which can keep it well above the 10,000-15,000 ft ceiling above which most guns are ineffective. The piston engine is a Rotax 914 turbo that runs on aviation fuel, and pushes the Predator at a slow speed of 120 KTAS. It’s controlled by UHF/VHF radio signals, and is designed to be flown by a pilot – without automated takeoff and landing.
The USAF also had an MQ-1B Block X/ YMQ-1C project underway, to develop a Predator system that would run on heavy fuel and carry up to 4 Hellfires. That project, and questions of cross-service compatibility, died when the USAF stopped buying MQ-1 Predators, and shifted its focus to the larger MQ-9 Reaper instead.
MQ-9 w. Paveways
(click to view larger)
The MQ-9 Reaper, once called “Predator B,” is somewhat similar to the Predator. Until you look at the tail. Or its size. Or its weapons. It’s called “Reaper” for a reason – while it packs the same surveillance gear, it is much more of a hunter-killer design than its counterparts. The Reaper is 36 feet long, with a 66 foot wingspan. Its maximum gross takeoff weight is a whopping 10,500 pounds, carrying up to 4,000 pounds of fuel, 850 pounds of internal/ sensor payload, and another 3,000 pounds on its wings. The MQ-9 has 6 pylons, which can carry GPS-guided JDAM family bombs and other MIL STD 1760 compatible weapons, Paveway laser-guided bombs, Sidewinder missiles for air-air self defense, and AIM-114P Hellfire missiles or laser-guided Hydra rockets. With that arsenal the Reaper becomes the equivalent of a close air support fighter with less situational awareness, less speed and less survivability if seen – but much, much longer on-station time than its manned counterparts.
MQ-1 vs. MQ-9
(click to view full)
The Reaper’s service ceiling is 50,000 feet unless it’s fully loaded, which can make a lurking MQ-9 very difficult to find from the ground. That wouldn’t have been as useful to the other aircraft due to the Hellfire missile’s short range, but the ability to drop GPS and laser-guided bombs makes precision combat strikes from 50,000 feet perfectly plausible. The engine is a Honeywell TPE 331-10T, which pushes it along at a rather speedier clip of 240 KTAS. Not exactly an F-16, or even an A-10, but the extra speed does get it to the problem area more quickly when a call comes in from the troops.
Several MQ-9 variants exist. An extended range variant adds fuel tanks, and lengthens the wingspan to 88 feet. US Special Operations Command (SOCOM) also flies the MQ-9 Reaper, and has its own MQ-1 Predator program, too. Both UAVs are referred to as Medium Altitude Long Endurance Tactical (MALET) platforms. If SOCOM has to bring the MALET to hammer a target down, or soften it up, they fly in enhanced variants with improved video transmission, infrared modifications, signals intelligence payloads, and “delivery of low collateral damage weapons.” The latter presumably includes precision mini-missile options like Raytheon’s Griffin, and precision glide bombs like Northrop Grumman’s GBU-44 Viper Strike and Lockheed Martin’s Scorpion, all of which allow a single Hellfire rail or weapon station to carry multiple weapons.
General Atomics’ Mariner maritime surveillance UAV and FAA-certified high-altitude Altair research UAV are both derived from the MQ-9 Reaper. So, too, is NASA’s Ikhana.
The Army’s MQ-1C Gray Eagle
The MQ-1C Sky Warrior/ Gray Eagle looks a lot like the Predator, but it’s a little bit bigger, can carry more weapons, and has an engine that can run on the same “heavy fuel” that fills up the Army’s land vehicles. The initial engine was Thielert’s 160hp Centurion, but the firm filed for insolvency after substantive revelations of accounting fraud (q.v. May 17/08), and in July 2013, its commercial assets were bought by China’s AVIC. Gray Eagles will continue to fly with existing stocks of the Thielert engine, but new UAVs will fly with Lycoming’s 250hp DEL-120.
Maximum operating altitude is 29,000 feet, at a speed of up to 135 knots. The sensor turret payload was initially Raytheon’s AN/DAS-2, but has shifted to the final “Army Common Sensor Payload” AN/AAS-53 variant. The Army also added a communications relay, and has been working to give the UAV “sense and avoid” capabilities for safety in crowded airspace.
An Improved Gray Eagle variant was introduced in July 2013, and this type has flown a 45 hour mission in unarmed configuration. It includes the new Lycoming DEL-120 engine, and a heavier airframe thanks to a deep belly design that raises internal fuel load from 575 pounds to 850 pounds. A 500-pound wet centerline hard point can be used to push the UAV’s fuel total to 1,350 pounds. The new MQ-1C IGE also has a maximum 540-pound internal payload capacity, compared to the MQ-1 Block 1′s 400 pounds. The end result is a maximum takeoff weight that rises from 3,600 pounds to 4,200 pounds.
Sensors and Add-Ons
ZPY-1 STARLite
click for video
Beyond its standard equipment, the US Army is also developing and qualifying new payloads for the MQ-1C fleet, thanks to efforts by Product Manager RUS (Robotic and Unmanned Sensors) and PM-ARES (Airborne Reconnaissance and Exploitation Systems).
AN/AAS-53 CSP+. Raytheon’s base Common Sensor Payload (CSP) is being upgraded, and CSP High Definition (HD) is planned for production cut-in in FY 2013. It adds high-definition Full Motion Video (FMV) in both the Electro-optical and Mid-wave IR spectrums. A retrofit plan will begin in FY 2014 to convert all MQ-1Cs to CSP HD. The Army sees CSP Target Location Accuracy (TLA) as the final upgrade, upgrading targeting accuracy to allow timely use of GPs-guided bombs and missiles. All Gray Eagles will eventually be equipped with CSP TLA.
AN/ZPY-1 STARLite-ER. Northrop Grumman’s Small Tactical Radar – Lightweight (STARLite) Synthetic Aperture Radar/ Ground Moving Target Indicator (SAR/GMTI) is a lightweight, high performance, all weather radar that can track small moving ground targets, down to small car size, even in bad weather. It cross-cues with the UAV’s cameras, and enhancements have been approved to extend its range, and detect man-sized targets. STARLite ER (Extended Range) has been cut into production since FY 2011, and will begin fielding and retrofitting in FY 2012. The Army plans to buy 1 STARLite ER system per UAV.
Sense and Avoid. Ground Based Sense and Avoid (GBSAA) is a system designed to be aware of other aircraft, especially in civil airspace, and help avoid collisions with the MQ-1C. The Phase 2, Block 0 system will provide the operator with an air traffic display, color-coded to reflect the highest-priority potential conflicts. The Block 1 system will add recommended maneuvers to avoid crashing into others. That isn’t the full sense-and-avoid you’d see on a commercial jet, but by 2015 it will let the Army fly the UAVs from Fort Hood, TX; Fort Riley, KS; Fort Stewart, GA; Fort Campbell, KY; and Fort Bragg, NC, through Class D military airspace, to nearby test ranges without a manned chase plane. As the acronym suggests, making this work requires certain equipment in place on the ground at those locations.
Traveler Pod. BAE’s pods are designed to find and eavesdrop on electronic emitters, identify them (enemy radio communications? radar? etc.), then offer aerial precision geolocation (APG) and copying. SIGINT/ELINT pods and equipment can already be installed in larger UAVs like the USAF’s RQ-4 Global Hawks, and aboard light surveillance planes like the Beechcraft King Air MC-12Ws. The challenge is to shrink them and their supporting systems within the MQ-1C’s weight and size limits.
NERO pod. Provides electronic jamming that can prevent remote detonation of land mines, giving the UAV a very useful convoy overwatch role. It can also disrupt enemy communications. Raytheon’s NERO is adapted from the CAESAR pod that equips manned C-12 (Beechcraft King Air) turboprops. Initial deliveries took place in 2013.
The Army’s ER/MP Program
Prep for flight
(click to view full)
The Gray Eagle began in August 2005, as “Team Warrior” won a $214.4 million contract to develop the Extended Range/ Multi Purpose Unmanned Aerial Vehicle System (ER/MP UAS). The Army wanted its ER/MP UAV to fill both surveillance and attack roles. General Atomics’ Sky Warrior, derived from their famous MQ-1 Predator, beat the Hunter II system offered by Northrop Grumman, Aurora Flight Systems, and IAI.
That was just the first step along the US Army’s $5 billion road to fielding a true Medium Altitude, Long Endurance, armed UAV, modified from the USAF’s famous MQ-1 Predator. Its position got a boost when a 2007 program restructuring short-circuited the Future Combat Systems Class III UAV competition, in favor of ER/MP. That decision has held.
A few years after the ER/MP program began, General Atomics-ASI’s Steve May was already saying that “The Army is now as large a customer for us as the Air Force.” At the time, the firm saw a potential market for as many as 540 “Sky Warrior” UAVs – 45 sets of 12 UAVs each for each brigade, plus accompanying ground stations and crews. The production program grew five-fold, but it’s still only about 30% of that maximum prediction.
The Systems Development and Demonstration (SDD) phase of GA-ASI’s multi-year ER/MP contract called for 17 MQ-1C UAVs, and 7 One System Ground Control Stations (OSGCS). Those pre-production Block 0 and Block 1 Gray Eagles have begun flying on the front lines, in Quick Reaction Component (QRC-1, 1R, and 2) deployments which began in December 2009, and continue to the present day. As noted above, QRC drones are unarmed, and lack other key capabilities. Even so, the Army has been very enthusiastic about their performance.
In 2010, the Army officially changed the planned number of production MQ-1C Gray Eagle Block I+ systems from 13 company-sized units of 12 aircraft, to 31 independent “UAS Platoons” with 4 UAVs each, plus the MQ-1C’s Standard Equipment Package (SEP), and Ground Equipment. The main production program would also buy 21 UAVs to replace those lost, and 7 training UAVs, for a total of 152.
By early 2013 this was changed again to equip 10 active duty divisions, 2 special operation units, 2 aerial exploitation units and the National Training Center with Gray Eagle companies equipped with 9 aircraft and 5 ground control stations each. Only the units getting deployed would get the extra 3 aircraft. Gray Eagle companies fit within each division’s Combat Aviation Brigade (CAB), following a model initiated in March 2012 at the 1st Infantry Division.
Excel
download
As the MQ-1C transitioned into production, Pentagon documents began breaking the program out from its USAF counterparts. The total program, including both the initial development contract and follow-on production, looks like it will be worth almost $5 billion. Budgets from 2004-2017 include:
There’s also a manpower equation for the Army, which affects ongoing operating costs. Those aren’t found in these budgets, but they make up well over half of a program’s actual lifetime cost. Fully automated take-off and landing (ATLS) systems are becoming more common among UAVs, and the MQ-1C’s ATLS an important difference from the USAF’s MQ-1 Predators, which have all flight operations handled by pilots. While the initial batch of Gray Eagle UAVs will be flown by Army aviators, the Army plans to assign future MQ-1Cs to non-pilot warrant officers with UAV training. That’s a less expensive proposition, in terms of both salary and training costs. It’s also less expensive in terms of lost UAVs, as ATLS seems to lead to fewer crashes.
Key MQ-1C industrial partners include:
Contracts & Key Events
FY 2014
MQ-1 IGE
(click to view full)
Dec 13/13: Support. General Atomics Aeronautical in Poway, CA receives an $110.4 million cost-plus-fixed-fee contract for continuing MQ-1C support and spares services until Dec 15/14.
$8 million in FY 2014 operations and maintenance funds are committed immediately. Work will be performed in Afghanistan and Poway, CA. One bid was solicited with one received by the US Army Contracting Command (Aviation) in Redstone Arsenal, AL (W58RGZ-14-C-0008).
Oct 22/13: Engine. During AUSA 2013, General Atomics confirms to DID that the US Army will use its existing inventory of Thielert Centurion heavy fuel engines to keep the current Gray Eagle fleet running for now, rather than doing wholesale retrofits. One presumes that retrofits would follow if Centurion stocks or part inventories drop too low.
Oct 22/13: Testing. GA-ASI uses their own funds to conduct a 45-hour MQ-1C Improved Gray Eagle flight, in reconnaissance-only configuration. They also confirm that new Gray Eagle IGEs will be built with Lycoming’s 205hp DEL-120 heavy fuel engine, replacing the discontinued Thielert Centurion (q.v. July 26/13).
A 2nd demonstration, which is planned for later in 2013, will feature an MQ-1C IGE with a wing-mounted external payload and weapons. Source: GA-ASI, Oct 22/13 release.
FY 2013
Annual order; NERO jamming pods delivered; What now for the USA drone fleets?; The pilot issue; FRP decision.
MQ-1C: what now?
(click to view full)
Sept 26/13: Support. General Atomics Aeronautical Systems, Inc. in Poway, CA receives an $86.6 million cost-plus-incentive-fee modification to finalize FY 2013 Gray Eagle performance-based logistics product support. The contract covers both newer, armed Block 1s program and the initial few Block 0/ Quick Reaction Capability drones.
Work is performed from Poway, CA. The contract was solicited via the web with one bid received. The U.S. Army Contracting Command – Redstone Arsenal (Aviation), Redstone Arsenal, AL, is the contracting activity (W58RGZ-12-C-007, PO 0032).
Sept 24/13: Djibooted. The small but strategically critical African state of Djibouti has forced the US military to move its drones out of Camp Lemonnier, which serves as Africa Command’s main base. Their problem? Lemonnier’s runway is too close to the international airport, and 5 Predator drone crashes since 2011 have left the locals unwilling to continue done flights.
The Pentagon has moved its drone operations to a more remote base, and the Gray Eagle’s automatic landing equipment makes it rather less crash-prone than USAF Predators and Reapers. At the same time, it’s an issue that the Army’s fleet will also face. Operations over a war zone are one thing. ISR support operations to aid friendly countries that have national and international air traffic moving through their space are a totally different kettle of fish. Sources: Washington Post, “U.S. moves drone fleet from Camp Lemonnier to ease Djibouti’s safety concerns” | VOA, “US Military Relocates Drone Fleet From Djibouti Base”.
Sept 25/13: Support. General Atomics Aeronautical Systems Inc. in Poway, CA receives a sole-source $70.2 million cost-plus-incentive-fee contract to conduct MQ-1C Gray Eagle 4.3.2 software development and depot repair of related spares.
Work will be funded from FY 2012 and 2013 R&D funds. US Army Contracting Command – Aviation in Redstone Arsenal, AL manages the contract (W58RGZ-13-C-0136).
Sept 25/13: STARLite radar. Northrop Grumman Systems Corp. in Linthicum Heights, MD receives an $85.3 million cost-plus-fixed-fee, multi-year, indefinite-delivery/ indefinite-quality contract to provide STARLite system support, including the SAR/GMTI features. Performance location and funding will be determined with each order. See the “Sensors and Add-Ons” section for full details re: the ZPY-1 STARLite.
This contract was a sole-source acquisition, but its duration isn’t clear. US Army Contracting Command – Aviation in Redstone Arsenal, AL manages the contract (W15P7T-13-D-C118).
Sept 25/13: General Atomics announces that the Gray Eagle fleet has reached 20,000 successful launch and recoveries using their Automatic Takeoff and Landing System (ATLS). They hit the 10,000 milestone in June 2012.
ATLS has been deployed at 8 sites worldwide, including 3 overseas, with 4 additional sites planned by January 2015. Source: GA-ASI, Oct 23/13 release.
Sept 13/13: FY 2013. General Atomics Aeronautical Systems, Inc. in Poway, CA receives a sole-source $199.7 million firm-fixed-price contract to provide FY 2013 MQ-1C Gray Eagle production (19 UAVs), and “FY 2012 hardware backfill requirements.” General Atomics confirmed that the overall contract involves 19 UAVs, plus ground control equipment, automatic landing systems, SATCOM and data terminals, spares, and mobile maintenance facilities.
Work will be performed in Poway, CA. US Army Contracting Command, Aviation at Redstone Arsenal, AL manages the contract (W58RGZ-13-C-0109).
Aug 25/13: Help Wanted. The USAF has a pilot recruitment problem for drones, driven by lower recognition and a true perception that promotions are less likely in that service. The US Army has an easier time of things, because they tap enlisted and non-commissioned soldiers to fly their UAVs: 15W Operator and 15E Repairer are enlisted soldiers positions, and 150U technician positions involve a warrant officer. Here’s the USAF’s math:
The USA has 61 round-the-clock UAV Combat Air Patrols, and plans to increase that to 65 by 2015. That increase is now suspect. If it’s maintained, the Pentagon’s April 2012 “Report to Congress on Future Unmanned Aircraft Systems Training, Operations, and Sustainability” says the USAF will require, at minimum, 579 more MQ-1/9 UAV pilots from December 2011 – 2015. In 2012, the 40 USAF training slots attracted just 12 volunteers, and training attrition rates are 3x higher than they are for regular pilots. Unlike the USAF’s manned aircraft training slots, only 33 RPA (Remotely Piloted Aircraft) training slots were filled (around 82%), triggered in part by the correct perception that those who succeed will have less successful careers. Based on present rates, 13% fewer RPA pilots have become majors, compared to their peers.
Army schadenfreude aside, the Pentagon’s April 2012 report did say that the Army needed to add 820 more MQ-1C Gray Eagle positions between December 2011 – 2015. They can’t neglect this area, either. Sources: Stars & Stripes, “Unmanned now undermanned: Air Force struggles to fill pilot slots for drones” | See Additional Readings section for full Pentagon report.
Aug 22/13: Training. General Atomics Aeronautical Systems, Inc. in Poway, CA receives a maximum $30.5 million cost-plus-incentive fee, option eligible, multi-year contract for 1 MQ-1C Gray Eagle Composite Maintenance System Trainer (CMST) suite of equipment, plus Interim Contractor Support at Fort Huachuca, AZ. US Army Contracting Command Aviation at? Redstone Arsenal, AL manages the contract (W58RGZ-13-C-0127).
Aug 16/13: Support. General Atomics Aeronautical Systems Inc. in Poway, CA receives an $11.4 million cost-plus-fixed-fee, option-eligible, non-multi-year, contract modification.
The award exercises an option for additional MQ-1C engineering services, and the announcement’s confusing language is “$11,423,474.37 with a cumulative maximum value of $156,370,264″. We’ve added all awards under this contract, and so far, announced awards total $81.9 million. But General Atomics clarifies that (since Sept 2009) “we have received contracts that value $156.4 million for Gray Eagle engineering services, including the $11.4 million contract that was just announced.”
Work will be performed in Poway, CA, using FY 2013 “other funding.” One bid was solicited, and 1 receives by US Army Contracting Command (Aviation) in Redstone Arsenal, AL (W58RGZ-09-C-0136, PO 0094).
July 26/13: MQ-1 IGE. A successful first flight of the Improved Gray Eagle (IGE) derivative of the MQ-1C Block 1, at GS-ASI’s Adelanto, CA facility.
IGE is designed for increased endurance, thanks to its “improved Heavy Fuel Engine” and deep belly fuselage with over 50% more capacity. In the field, that translates into up to 23 more hours aloft on reconnaissance missions. Overall payload capacity also improves by 50%, with an upgraded centerline wet hardpoint that can mount a 500 pound external fuel tank or a 360 degree sensor payload. General Atomics also cites the “potential of incorporating lightning protection, damage tolerance, and Traffic Collision Avoidance System (TCAS) features.” Source: General Atomics, July 26/13 release.
Improved Gray Eagle introduced, flies
July 23/13: Engine out. State-owned Aviation Industry Corp. of China buys Thielert’s commercial assets out of insolvency, and folding them into its Continental Motors division. In order to get approval for the sale from the German government, however, the firm has to divest its military business. They elect to close it, leaving the MQ-1C Gray Eagle and Turkey’s Anka UAV without an engine. Sources: Bloomberg, “AVIC Buys Thielert to Shift Company to Planes From Drones” | Reuters, “China’s AVIC to buy German aircraft engine maker Thielert”.
Thielert to China
June 14/13: FRP. The Defense Acquisition Board approved Gray Eagle for Full Rate Production (FRP), which will lead to the purchase of an additional 49 aircraft over FY13-15. Because of the current budget constraints, the FY13 buy was reduced from 19 to 15. FY14 is planned for an additional 19, with a final 15 units in FY15.
Deputy Program Manager Jeff Crabb tells DID that the program was also moved from the ACAT 1D down to the ACAT 1C level, meaning the Army is now the Milestone Decision Authority (MDA), as opposed to the Office of the Secretary of Defense. This makes sense since close to 70 aircraft have already been delivered after 3 LRIP lots, out of a planned total of 152. Of these, 4 have been lost in combat so far.
The program’s next milestone is Follow-on Operational Test & Evaluation (FOT&E) in early 2015, mostly around the universal ground control station (GCS) which involves both hardware and software components.
FRP
May 14/13: NERO EW pod. Raytheon announces that they’ve delivered the first 2 Networked Electronic Warfare, Remotely Operated (NERO) pods, as part of a contract awarded by US NAVSEA-Crane in 2012 for use on the US Army’s MQ-1C Gray Eagle.
NERO is an airborne electronic attack system capable of jamming enemy communications systems, including remote detonators for land mines. It’s derived from the Army’s Communications Electronic Attack with Surveillance and Reconnaissance (CEASAR) program, which is mounted on MC-12W King Air manned turboprops. Moving to the Gray Eagle doubles or triples flight time, at a similar or lower operating cost. Raytheon.
May 7/13: Support. GA-ASI in Poway, CA receives a $110.3 million cost-plus-incentive-fee contract modification for MQ-1C support and fleet sustainment, driving the contract’s total cumulative face value to $354.7 million.
Work will be performed in Afghanistan, using FY 2013 Operations and Maintenance funds, and other Procurement fund. The US Army Contracting Command in Redstone Arsenal, AL manages the contract (W58RGZ-12-C-0075, PO 0032).
April 10/13: FY 2014 Budget. The President releases a proposed budget at last, the latest in modern memory. The Senate and House were already working on budgets in his absence, but the Pentagon’s submission is actually important to proceedings going forward. See ongoing DID coverage. For the Gray Eagle, the budget requests $627.1 million, of which just $10.9 million is RDT&E. That’s a cut of about $151.8 million from previous plans, and when combined with 2015 plans it cuts the program by $337.8 million. They’re still ordering the same number of UAVs, though.
The FY 2014 request covers continued development of the Universal Ground Control Station, a Ground Based Sense-and-Avoid system for flights at several US based locations (vid Aug 10/12 entry), 15 UAVs, 8 AN/ZPY-1 STARLite ER radars, 8 AN/AAS-53 Common Sensor Payload surveillance & targeting turrets, 16 Tactical SIGINT (TSP for signals interceptions) payloads, and 3 modular platoon sets of equipment.
April 2/13: What now? Defense News aptly summarizes the key question facing the USA’s large drones:
“On the one hand, the work in Mali shows that the signature weapon of the U.S. war in Afghanistan is outlasting that conflict. On the other, the detachment is a tiny fraction of the Predator/Reaper fleet – and just where are the rest of them going to go?”
With flights below 60,000 feet heavily restricted within the USA, there aren’t that many options stateside, and most of the MQ-9 fleet’s $8,000 per flight hour operations are funded by wartime OCO appropriations. AFRICOM may have the best combination of circumstances abroad, thanks to growing trouble in the Gulf of Guinea to the West, as well as the Indian Ocean to the East. Even a massive increase in surveillance can’t absorb all of the UAVs, and the $6,000 per flight hour manned MC-12s are a natural competitor.
FY 2012
Attack helicopter control MQ-1C in flight; Operational Testing & Evaluation; Approval sought to extend LRIP buys; Predator GCS virus won’t affect Army; SIGINT pod.
Gray Eagle in Iraq
(click to view full)
Unless otherwise specified, the U.S. Army Aviation and Missile Command in Redstone Arsenal, AL issues the contracts to General Atomics Aeronautical Systems, Inc. (GA-ASI) in Poway, CA.
Oct 2/12: Support. A $102.6 million cost-plus-incentive-fee contract for services to support the Gray Eagle UAS.
Work will be performed in Poway, CA, with an estimated completion date of May 7/13. One bid was solicited, with one bid received (W58RGZ-12-C-0075).
Oct 2/12: Engine retrofits. A $10.7 million cost-plus-fixed-fee contract modification to retrofit MQ-1C Block 0 UAVs with an alternate heavy fuel engine.
Work will be performed in Poway, CA with an estimated completion date of Sept 26/13. One bid was solicited, with one bid received (W58RGZ-12-C-0001).
Aug 27/12: A $25.9 million fixed-price-incentive contract modification will add “a platoon set of ground equipment.” Note that for these UAVs, a “platoon” is 12 MQ-1Cs.
Work will be performed in Poway, CA with an estimated completion date of June 30/15. One bid was solicited, with one bid received (W58RGZ-12-C-0057).
Aug 27/12: An $11 million fixed-price-incentive contract modification, to buy more universal ground data terminals. Work will be performed in Poway, CA with an estimated completion date of April 30/14. One bid was solicited, with one bid received (W58RGZ-11-C-0099).
Aug 10/12: Civil airspace. The U.S. Army has validated the design and functionality of a Phase 2 ground-based sense and avoid (GBSAA, see above) radar system that will support training flights of MQ-1C Gray Eagle UAVs in unrestricted airspace, beginning in 2014.
The baseline GBSAA system was demonstrated in June 2012 at Dugway Proving Ground’s unmanned aircraft systems (UAS) testbed, and the Army’s UAS Rapid Integration and Acceptance Center. The 2-week demonstration covered several “vignettes” involving live RQ-7 Shadow and RQ-5 Hunter UAVs as well as simulated UAVs and intruder aircraft. The testing also replicated the airspace over other military installations and used live and recorded air traffic data from Salt Lake City, UT and Boston’s Logan airports. AIN Online.
July 18/12: A $19 million cost-plus-fixed-fee contract modification for MQ-1C contractor logistics support. Work will be performed in Poway, CA with an estimated completion date of July 15/13. One bid was solicited, with 1 bid received (W58RGZ-11-C-0001).
July 11/12: A $411 million fixed-price-incentive contract for Gray Eagle systems, initial spares, and additional hardware. Work will be performed in Poway, CA with an estimated completion date of March 31/15. The bid was solicited through the Internet, with one bid received (W58RGZ-12-C-0057).
Looks like they got that authorization to continue Low-Rate initial Production.
July 2/12: Support. General Atomics Aeronautical Systems, Inc. in Poway, CA receives an $8.6 million cost-plus-fixed-fee contract modification for MQ-1C Gray Eagle engineering support.
Work will be performed in Poway, CA, with an estimated completion date of Sept. 30/13. One bid was solicited, with one bid received. The U.S. Army Contracting Command at Redstone Arsenal, AL manages the contract (W58RGZ-09-C-0136).
June 27/12: Reliability & report. The US Army has some good news, and some bad news.
The bad news is that Gray Eagles are flying at about 80% availability rates after 24,000 combat flight hours, instead of their target 90%. The problems are mostly traceable to software issues that arise when new sensors are added.
The good news? The program is under budget. The UAVs have added weapons, ground-looking radars, and communication relays to their payload. The Army likes them a lot, and thinks they’re making a big difference, so they’ve decided to focus on expanding Gray Eagle capabilities for now, rather than trying to reach 90% availability rates. Right now, there are a pair of platoon-size 4-UAV QRC units in Afghanistan, and the “Fox 227″ full-size company of 12.
May 29/12: IOT&E funds. An $8.5 million cost-plus-incentive-fee contract modification supplies incremental funding to support MQ-1C operational test and evaluation. The program’s IOT&E was moved back from October 2011, and is now expected in August 2012 (a milestone that was indeed met at that date).
Work will be performed in Poway, CA, with an estimated completion date of Nov 30/12. One bid was solicited, with one bid received (W58RGZ-05-C-0069).
May 10/12: A $141.8 million cost-plus-incentive-fee contract, for services in support of the MQ-1C Gray Eagle. Work will be performed in Poway, CA, with an estimated completion date of May 7/13. One bid was solicited, with 1 bid received (W58RGZ-12-C-0075).
April 4/12: Plans. The US Army discusses its plans for the MQ-1C, which includes the addition of a new Synthetic Aperture Radar with Ground Moving Target Indicator, and the development of a Universal Ground Control Station, or UGS that can show video feeds from Gray Eagle, Shadow and Hunter UAS on a single system.
A full company of 12 Gray Eagle UAS have now deployed as part of a full-spectrum Combat Aviation Brigade, and a Pentagon Defense Acquisition Board meeting is planned for mid-May 2012, to approve another Low Rate Initial Production buy. Initial Operational Test & Evaluation is scheduled for summer 2012.
March 30/12: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs” for 2012. With respect to the MQ-1C, it mentions that the Army will be modifying the UAV’s tail rudder and elevator, and the GAO is now satisfied with the automatic take-off and landing system’s technical maturity:
“However, the tactical common data link is still not fully mature… its air data relay capability has been deferred until fiscal year 2012. The March 2011 accident involving an MQ-1C in testing has delayed several key program events… The Army now plans to start [IOT&E] operational testing in August 2012 [instead of October 2011, and a]… full-rate production decision was postponed from August 2012 to March 2013. The Army has already awarded two low-rate production contracts in 2010 and 2011 for 55 aircraft. To avoid a break in production, the Army is planning to seek approval to award a third low-rate contract for 29 aircraft in May 2012. Based on the current program schedule, the Army will procure more than half of the total planned aircraft before the system’s operational effectiveness and suitability is fully tested…”
Jan 26/12: Preliminary FY 2013 budget materials discuss coming shifts in Pentagon priorities, as the defense department moves to make future cuts. The USAF will get fewer MQ-9 Reapers, but the Army’s MQ-1C is protected:
“Unmanned Air Systems – fund enough trained personnel, infrastructure, and platforms to sustain 65 USAF MQ-1/9 combat air patrols (CAPs) with a surge capacity of 85; the Predator aircraft was retained longer than previously planned, allowing us to slow the buy of the Reaper aircraft and gain some savings; we also protected funding for the Army’s unmanned air system, Gray Eagle.”
See: Pentagon release | “Defense Budget Priorities and Choices” [PDF]
Jan 17/12: A $30.3 million cost-plus-incentive-fee contract modification to support the MQ-1C Gray Eagle Quick Reaction Capability drones in theater. Work will be performed in Poway, CA, with an estimated completion date of May 7/12. One bid was solicited, with one bid received (W58RGZ-09-C-0153).
Jan 5/12: SIGINT Pods. BAE Systems in Nashua, NH receives a $12.3 million firm-fixed-price and cost-plus-fixed-fee contract for T-Pod SIGINT Systems. on the MQ-1C Unmanned Aircraft System. A December 2011 expression of interest stated that the US Army was looking for up to 5 tested and calibrated Traveler Pods within 4 months for integration work on the MQ-1C, and within 6 months for deployment. The pods are designed to find and eavesdrop on electronic emitters, identify them (enemy radio communications? radar? etc.), then offer aerial precision geolocation (APG) and copying. Pods and equipment can already be installed in larger UAVs like the USAF’s RQ-4 Global Hawks, and aboard light surveillance planes like the Beechcraft King Air MC-12Ws. The challenge is to shrink them and their supporting systems so that it falls within the MQ-1C’s weight and size limits.
Work will be performed in Nashua, NH, with an estimated completion date of Dec 27/12. One bid was solicited, with 1 bid received by US Army Contracting Command at Aberdeen Proving Ground, MD (W15P7T-12-C-C009). See also FBO.gov.
Jan 5/12: A $20.5 million cost-plus-incentive-fee contract modification to pay for operational test and evaluation. It does not specify further, but the contract is the MQ-1C’s.
Work will be performed in Poway, CA, with an estimated completion date of Nov 30/12. One bid was solicited, with one bid received (W58RGZ-05-C-0069).
Dec 30/11: A $12 million cost-plus-fixed-fee contract for Warrior A/Block 0 support services. These are the Quick Reaction Capability drones. Work will be performed in Poway, CA, until Dec 17/13. One bid was solicited, with one bid received (W58RGZ-12-C-0001).
Dec 23/11: An $18 million cost-plus-incentive-fee contract. “The award will provide for the modification of an existing contract to allow for incremental funding of previous change order”; it does not specify further, but the contract is the MQ-1C’s. Work will be performed in Poway, CA; Hunt Valley, MD; Salt Lake City, UT; and Lake Forest, CA, with an estimated completion date of Dec 31/11. One bid was solicited, with 1 received (W58RGZ-05-C-0069).
Nov 10/11: A $15.2 million cost-plus-fixed-fee and cost-plus-incentive-fee contract modification, to support the MQ-1C QRC contingents. Work will be performed in Poway, CA, with an estimated completion date of Jan 7/12. One bid was solicited, with one bid received (W58RGZ-09-C-0153).
Nov 9/11: An AH-64D Apache Block III attack helicopter fitted with the Unmanned Aerial Systems Tactical Common Data Link Assembly (UTA) atop its mast has controlled the payload and flight of an MQ-1C Grey Eagle UAV, while both are in flight. This marks the 1st time an unmanned vehicle has been controlled from the cockpit of an Apache helicopter.
Lockheed Martin says that the test program proved the UTA’s design, adding that: “All goals of this phase of UTA testing were completed with 100 percent success.”
Oct 17/11: A $30.3 million cost-plus-fixed-fee contract modification for additional MQ-1C engineering services. Work will be performed in Poway, CA, with an estimated completion date of Aug 30/12. One bid was solicited, with 1 bid received (W58RGZ-09-C-0136).
Oct 7/11: Hacked. WIRED Danger Room reports that a “keylogger” virus has infected the USAF’s MQ-1A/B Predator and MQ-9 Reaper fleets:
“The virus, first detected nearly two weeks ago by the military’s Host-Based Security System, has not prevented pilots at Creech Air Force Base in Nevada from flying their missions overseas. Nor have there been any confirmed incidents of classified information being lost or sent to an outside source. But the virus has resisted multiple efforts to remove it from Creech’s computers, network security specialists say… “We keep wiping it off, and it keeps coming back,” says a source familiar with the network infection, one of three that told Danger Room about the virus. “We think it’s benign. But we just don’t know.”
Unlike the USAF, the Army’s philosophy is to operate its MQ-1C Gray Eagles in-theater. The virus doesn’t compromise Army UAVs, therefore, but it may indicate a similar vulnerability point in the Army’s network.
Oct 5/11: Support. General Atomics Aeronautical Systems, Inc. in Poway, CA receives an $84.8 million cost-plus-fixed-fee contract. The award will provide for the logistics and hardware services in support of Gray Eagle First Unit Equipped system hardware.
Work will be performed in Poway, CA, with an estimated completion date of March 27/13. One bid was solicited, with one bid received. The U.S. Army Contracting Command at Redstone Arsenal, AL manages the contract (W58RGZ-11-C-0143).
Oct 5/11: An $8.8 million cost-plus-fixed-fee contract will fund RESET efforts for the Warrior A/Warrior Block 0 Unmanned Aircraft Systems. RESET is a program for worn vehicles and aircraft, involving tear-down and comprehensive inspections, followed by replacement of any worn parts, and restoration to “like new” condition. The question is whether these initially-fielded “Quick Reaction Capability” UAVs will be upgraded to full operational MQ-1C Block 1 status, complete with weapons.
Work will be performed in Poway, CA, with an estimated completion date of June 30/13. One bid was solicited, with 1 bid received (W58RGZ-11-C-0001).
FY 2011
MQ-1C program ramp-up; USAF accepts last MQ-1B Predator; TRACER foliage-penetrating radar; Iraq quick reaction deployment discussed.
QRC-1 sunrise, Taji
(click to view full)
May 20/11: An $8.9 million cost-plus-fixed-fee, cost-plus-incentive-fee contract, that buys additional spare hardware under the MQ-1C Gray Eagle’s logistics support contract. Work will be performed in Poway, CA, with an estimated completion date of Jan 18/12. One bid was solicited, with 1 bid received (W58RGZ-09-C-0153).
May 10/11: Support. General Atomics Aeronautical Systems, Inc. in Poway, CA receives an $9 million cost-plus-fixed-fee contract May 6/11. The award will provide for MQ-1C Universal Ground Control Station integration.
Work will be performed in Poway, CA, with an estimated completion date of June 30/11. One bid was solicited, with one bid received. The U.S. Army Contracting Command at Redstone Arsenal, AL manages the contract (W58RGZ-09-C-0136).
April 25/11: An $8.3 million cost-plus-incentive-fee contract, providing incremental funding to cover an extension of the ER/MP system development and design contract. Work will be performed in Poway, CA, with an estimated completion date of Dec 31/11. One bid was solicited with 1 bid received by U.S. Army AMCOM Contracting Center in Redstone Arsenal, AL (W58RGZ-05-C-0069).
April 12/11: +26. $173.5 million of a $354 million fixed-price-incentive-fee contract, for MQ-1C Gray Eagle low rate initial production. Queries to GA-ASI indicate that the contract covers 2 Gray Eagle systems: 26 UAVs (12 aircraft per system, plus 2 spares for losses), 15 of AAI’s OneSystem Ground Control Systems, L-3 Communications’ Satellite Communications equipment, and other peripheral equipment to support the systems.
GA-ASI says that part of this contract is for FY 2010 buys, and part is FY 2011. Work will be performed at Poway, CA, with an estimated completion date of April 30/14. One bid was solicited and one received (W58RGZ-11-C-0099).
March 7/11: A $64.3 million cost-plus-fixed-fee, cost-plus-incentive-fee contract modification for MQ-1C Gray Eagle product support, logistical support and sustainment operations.
Work will be performed in Poway, CA; Adelanto, CA; Palmdale, CA; Salt Lake City, UT; and Hunt Valley, MD, with an estimated completion date of Nov 7/11. One bid was solicited with one bid received (W58RGZ-09-C-0153).
March 3/11: The USAF accepts delivery of its 268th and last Predator UAV, an MQ-1B, at General Atomics’ Gray Butte Aeronautical Systems’ Flight Ops Facility. The delivery leaves the US Army as the only customer for MQ-1 Predator UAVs, unless the RQ-1 Predator XP variant finds some export customers.
Col. James Beissner, Air Combat Command’s Chief Irregular Warfare Division, accepted the aircraft. Aeronautical Systems Center’s Chief of Medium Altitude UAS Division, Col. Christopher Coombs, cites fleet totals of over 900,000 hours since its 1st flight in July 1994, with mission capable rates over 90%. What he does not mention is a high accident rate, which accompanies UAVs without auto-takeoff and landing capabilities. The Army’s MQ-1C Gray Eagle does not suffer from the same officer pilot bias as the USAF, and has adopted these technologies. Wright Patterson AFB | General Atomics.
Milestone
March 2/11: +30. General Atomics Aeronautical Systems, Inc. in Poway, CA receives an announced $335.5 million fixed-price-incentive-fee contract for MQ-1C Gray Eagle systems. In-depth discussions with General Atomics place the order in its full context, which is somewhat complex.
In February 2010, General Atomics says the US Army placed a not-to-exceed $399 million contract, but did not appropriate any money. Their first step was the $195.5 million 49% funding contract in the May 19/10 entry. According to the firm, this award funds the remaining contract with another $115.1 million, to make a total of $310.6 million. This will include the LRIP Lot 1 order for 2 systems (24 UAVs + 2 attrition), plus the FY 2009 supplemental funding of 8 UAVs, and a sizable quantity of plus-up air, ground and communication equipment.
Work will be performed in Poway, CA, with an estimated completion date of Dec 31/12. One bid was solicited with one bid received (W56RGZ-10-C-0068).
Feb 14/11: Budget request. The Pentagon releases its FY 2012 budget request, which includes breakout information concerning the MQ-1C Gray Eagle program. The FY 2012 request is $805.8 million for 36 systems, which includes $137 million in RDT&E(Research, Development, Testing & Evaluation) funds.
Jan 18/11: Program ramp-up. A US Army release quotes Tim Owings, deputy project manager for Army Unmanned Aircraft Systems:
“We’re going to accelerate Gray Eagle yet again. We’re accelerating from two systems per year to three systems per year, which will result in seventeen systems being procured by FY 2014… Defense Acquisition Board in February of this year is expected to confirm the addition of two more Low Rate Initial Production Gray Eagle systems – each consisting of 12 air vehicles, five ground control stations and five additional attrition vehicles… The Army has already deployed two Gray Eagle “Quick Reaction Capabilities.” One QRC is now flying with Army Soldiers in Iraq and another is with U.S. Special Operations Forces in Afghanistan”
Nov 28/10: Iraq T&P work. A posting from the 1st Infantry Division discusses [Pentagon DVIDS | US Army] some of the work that goes into the Gray Eagle’s Quick Reaction Capability 1-Replacement 1 (QRC-1/R1) deployment in Iraq, which is working to pioneer Gray Eagle tactics, techniques and procedures before the UAVs are deployed throughout the Army. Some excerpts:
“The QRC1-R1 operators are working with aviators from the brigade’s Apache battalion to integrate their mission… The unit has flown nearly 7,000 accident free hours, more than 350 combat missions, produced over 16,000 surveillance-type images, and maintained a systems operational readiness rate of about 93 percent [in its first 6 months].
“…One of the biggest things we try to do is educate other units about our capabilities,” said [unit commander Capt. Michael] Goodwin. “A lot of units have the ability to use our assets, but they don’t know what we can do.” One of the most useful tools the unit offers ground troops is education on a portable system known as the OSRVT, or One Station Remote Viewing Terminal. “We’re finding that a lot of units have the OSRVT, but don’t know what it does for them,” said Goodwin. “Our company helps train the ground guys on the system, on how to access our feeds and use our aircraft to support them.” …The unit is working to prepare the aircraft to carry hellfire missiles, and is scheduled to conduct a live test of the missiles in Iraq this January.
Sgt. Brent Randal, a Gray Eagle operator deployed with QRC1-R1 and a native of Las Vegas, Nev., said that one of the aircraft’s best features is its new Synthetic Aperture Radar, or SAR. Mounted underneath the Gray Eagle’s nose, the SAR can compare high resolution images of a location taken at different times to determine whether objects have been removed from or placed at a scene… The Gray Eagle can also help ground troops communicate with their headquarters over long distances. The success of [Predator drones he flew for Task Force ODIN] helped pave the way for the Army’s acquisition of the Gray Eagle, said [former scout Staff Sgt. Raymond] Ballance.”
Nov 19/10: General Atomics Aeronautical Systems, Inc. in Poway, CA receives a $31.9 million cost-plus-incentive-fee contract, providing incremental funding to cover an extension of the ER/MP system development and design contract. Work will be performed in Poway, CA, with an estimated completion date of Dec 31/10. One bid was solicited with one bid received by U.S. Army AMCOM Contracting Center in Redstone Arsenal, AL (W58RGZ-05-C-0069).
Announced System Development & Demonstration contracts covered here, not including any UAV buys or any support contracts, now stand at $253.4 million.
Nov 8/10: STARLite radar. Northrop Grumman announces a contract for 40 more AN/ZPY-1 STARLite synthetic aperture ground-looking radars, bringing announced orders to 73. These lightweight radars include Ground Moving Target Indicator (GMTI) capabilities, and will equip the Army’s MQ-1C Gray Eagle UAVs,. Under the terms of the contract option, deliveries to the Army’s Product Manager Robotic & Unmanned Sensors Program Management Office will begin in March, 2011 and conclude in March, 2012.
Pat Newby, vice president of Weapons and Sensors for Northrop Grumman’s Land and Self Protection Systems Division. “STARLite completed all first article and government testing requirements, which led to this award. These systems are ready now for immediate deployment.” See Feb 11/10, Apr 28/08 entries for more.
Oct 27/10: TRACER radar. Lockheed Martin’s tree-penetrating Tactical Reconnaissance and Counter-Concealment-Enabled Radar (TRACER) flies for the 1st time aboard NASA’s Ikhana MQ-9, because the Army Gray Eagle MQ-1C fleet that will eventually host the external unpressurized TRACER pods are all busy on operations.
TRACER is a dual-band synthetic-aperture radar (SAR), designed to detect vehicles, buildings and other man-made objects that are buried, camouflaged or concealed under trees and other foliage. The flight tests on Ikhana focused on the radar’s performance in the harsh environment of the unpressurized pod, as the TRACER system will eventually be installed on a variety of manned and unmanned aircraft. Lockheed Martin.
FY 2010
ER/MP becomes “Gray Eagle”; Army hits 1 million total UAV hours; USAF bows out of Predator buys, ending UAV War; MQ-1C arming approved; Hellfire missile tests; 1st STARLite radars delivered.
MQ-1C test flight
(click to view full)
Oct 4/10: Support. General Atomics Aeronautical Systems in Poway, CA receives a $5.8 million cost-plus-fixed-fee contract modification for ER/MP engineering and integration support, integrated logistics support, and program management. It was actually issued at the end of FY 2009.
Work will be performed in Poway, CA, with an estimated completion date of Sept 30/11. One bid was solicited with 1 bid received by the US Army at Redstone Arsenal (W58RGZ-09-C-0136, PO 0018).
Sept 10/10: A $7.2 million cost-plus-fixed-fee contract modification for ER/MP Quick Reaction Capability contractor logistics support replenishment sustainment spares. Work is to be performed in Poway, CA with an estimated completion date of June 6/12. One bid was solicited with 1 bid received (W58RGZ-09-C-0153).
Aug 24/10: The ER/MP’s new name is confirmed during a US Army UAS panel discussion at AUVSI Unmanned Systems North America. Us Army UAS US Army Project Manager Col. Gregory Gonzalez says that using both ER/MP and SkyWarrior had created name recognition issues, and the USAF had approved the name. US Army Training and Doctrine Command (TRADOC) Capabilities Manager Col. Robert Sova adds:
“That’s ‘Grey Eagle’ as ‘G-R-E-Y’… The naming nomenclature, of course, is usually after an Indian chief or Indian tribe and I would suggest that you look up ‘Grey Eagle,’ because there is a good history of that particular Indian chief and his lineage with the army and special operations. So it is not only a cool’ name, it has substance and meaning behind it.”
We’re not the only ones scratching our heads about this reference, which is probably a mistake that stems from believing too many things on the Internet. Though we do like Shephard Group | this Chief Gray Eagle.
<p class="col-labe