2014-10-13



LHA-R/NAAS Concept
(click to view full)

Modern U.S. Navy Amphibious Assault Ships project power and maintain presence by serving as the cornerstone of the Amphibious Readiness Group (ARG) / Expeditionary Strike Group (ESG). LHA/LHD are a key element of the Seapower 21 doctrine pillars of Sea Strike and Sea Basing, transporting, launching, and landing elements of the Marine Expeditionary Brigade (MEB) via a combination of LCAC hovercraft, amphibious transports and vehicles, helicopters, and aircraft.

Designed to project power and maintain presence, LHA-Replacement (LHA-R, aka. LH-X, and now the New Amphibious Assault Ship or NAAS) large deck amphibious assault ships were slated to replace the US Navy’s 6 LHA-1 Tarawa Class vessels. They are based on the more modern LHD Wasp Class design, with the LHD’s landing craft and well deck removed in favor of more planes and hangar space. While its LHA/LHD predecessors were amphibious assault ships with a secondary aviation element, it’s fair to describe the America Class as escort carriers with a secondary amphibious assault role.

The NAAS Program



LHA-R concept
(click to view: large!)

The LHA-R program may have been in the works since PMS-377 was put in charge in November 2000, but it took several years to get underway as a major spending program.

LHA 6 America, the lead LHA-R vessel, was planned for delivery to the U.S. Navy in October 2013, though when that date came and went, sea trials had yet to take place. It and should be in service by 2015. The ultimate question is how many ships of class will be built. Support for the limited NAAS buy of 2 ships is already set, and LHA 7 Tripoli is due for delivery in June 2018. The question is the 3rd ship, and any ships after that.



The FY13-18 FYDP does feature a 3rd “LHA-R” ship in FY 2017, pushed back a year from the original plan. In April 2009, Gannett’s Navy Times revealed that the Marines were having second thoughts about the well deck removal, and the limitations this created for the total force. Altering ship plans for LHA 6 or LHA 7 would have been too expensive, but “LHA 8’s” planned cost, and these previous statements by the Navy and Marines, suggest that this ship will have a well deck. Low amounts allocated for LHA 8 design also indicate that any well-deck equipped ship is likely to be a fairly close derivation of an existing design. So, too, does the math inherent in the ships’ volume and internal layout limits. In other words, LHA 8 looks set to be a slightly updated variant of the all-electric LHD 8 Makin Island design. In effect, it would become “LHD 9″. This return of the well deck is later confirmed as the “Flight 1″ configuration.

The ship’s timeline at the end of the FYDP makes it vulnerable to further budget cuts, and so does the higher price of a well deck equipped vessel. The FYDP has set aside $4.4 billion, compared to the Navy’s 2012 estimates of $3.2 – $3.3 billion per ship for the America Class. Time will tell whether the 3rd New Amphibious Assault Ship survives.

Note that even at that lower price, America Class ships already far exceed the cost of smaller LHDs like France’s 21,500t helicopter-only Mistral Class LHD (EUR 325M/ $485M), though the American ships are designed to naval survivability levels, and feature far more advanced defenses and launch capabilities.

A better comparison may be Australia’s 27,500t, jet-capable Canberra Class LHDs (AUD$ 1.6 billion/ USD$ 1.4 billion per), or Italy’s 27,100t Cavour Class escort carrier, which combines F-35B launch capability with housing for troops, and vehicle ramps for heavy vehicles stored inside (about EUR 1.5 billion/ $1.975 billion). Measured on a per-ton basis, their cost is not all that far off. The tactical tradeoff is that larger ships like the America Class gain new fighter spots and storage capacity faster than they grow in tonnage. On the flip side, they offer less survivability and mission flexibility than 2 Cavour Class ships might enjoy.

The LHA-R Ships: 21st Century Escort Carriers

LHD Wasp Class
(click to view full)

LHA-R/NAAS design modifications aimed to optimize aviation operations and support activities. The end product is essentially a revival of the World War 2 escort carrier concept, with integrated berthing, cargo, and light vehicle spaces for Marines.

At 844 feet long and 106 feet wide, LHA-R ships will be almost 80 feet longer than USS Wasp and 10 feet wider, since they don’t have to fit through the Panama Canal. As a result, these ships will weigh in at 45,594 long tons fully loaded, rather than LHD 8’s 41,649t full load. The Navy prefers not to call their America Class ships carriers, but will admit that they’re an “aviation centric” design. In plain English, they’re really CVL/CVE aircraft carriers with crew space for 1,204, that can also berth up to 1,686 Marines, with a possible surge to 1,800 people for short periods of time. These NAAS ships will rely on a mix of fixed-wing and rotary aircraft for most of their tasks, from close air support, to transport, to helicopter coverage.

Protection comes in 3 layers, from the medium-range Evolved SeaSparrow launchers, to the short-range RAM missile system, to close-in defenses that range from radar-guided Mk.15 Phalanx 20mm gatling guns to a range of decoy systems. Few small carriers have defenses this comprehensive, and some full-size carriers in Britain and India will also fall short by comparison. Even so, advances in modern cruise missiles makes the Navy doubt LHA-R’s survivability against a determined multi-missile swarm.

DID uses the term “escort carriers” due to their relative size compared to America’s 95,000t+ nuclear-powered supercarriers, and also due to the size of their aerial complement, which is reduced by the ship’s amphibious mission. Nevertheless, it’s worth noting that the America Class’ overall displacement is larger than France’s 43,000t FS Charles De Gaulle nuclear-powered aircraft carrier, or the American World War 2 Essex Class carriers’ 36,380t.

Like the Tarawa and Wasp classes, NAAS ships will have a flat flight deck, without a “ski ramp” on the front. With a ski ramp, V/STOL (Vertical/Short Take-Off and Landing) fighters like the Harrier, STOVL (Short Take-Off, Vertical Landing) fighters like the F-35B, UAVs, or tilt-rotor aircraft can all take off with larger loads, while using less fuel. On the other hand, a fully flat deck increases the number of deck locations available for landing or parking aircraft.

The US Navy thought hard about this choice. During the Analysis of Alternatives phase, they considered a 69,000 ton “Dual Tram Line” option with an LHD 8 sized well deck for hovercraft, an angled flight deck like an aircraft carrier’s, and a ski ramp that allows aircraft to take off with heavier loads. Existing F-35B-capable platforms that already use the ski ramp approach include Britain’s new 65,000t Queen Elizabeth Class carriers, Italy’s new 27,100t Cavour Class aircraft carrier/LHD, and Navantia’s 27,500t BPE / Canberra Class LHDs. The Navy eventually chose to pursue a design based on LHD 8 Makin Island instead, as the path of least risk and best cost containment. For good or ill, they also decided against adding a ski ramp.

Eliminating the ramp did give them a couple more “spot factors.” A ship’s possible aircraft combinations are calculated by totaling “spot factors” (SF), and amphibious ships use the CH-46E Sea Knight’s space requirements as their base (1.0). The aged Sea Knights are being phased out, however, and will not be part of the America Class’ 58.0 Spot Factor air wings. Instead, these air wings are expected to include MV-22 Osprey tilt-rotors (2.22 SF), CH-53E/K heavy transport helicopters (2.68/?), MH-60R/S multi-role utility helicopters (1.0), UH-1Y troop transport helicopters (0.94), and AH-1Z attack helicopters (0.92); and/or 6-23 fixed wing F-35B Lightning II STOVL fighters (2.0).

These new aircraft, and the MV-22 in particular, drove many of the ship’s key requirements. When one compares the “standard” complements of the LHA-R vs. the existing LHD Wasp Class, the result is about a 45% increase in required “spot factors,” for the same number of airframes: [1]

12 MV-22 vs. 12 CH-46 (+14.64 SF)

2 MH-60S vs. 2 UH-1 for SAR (+0.14 SF)

4 CH-35K vs. 4 CH-53E (assumed even)

3 UH-1Y vs. 3 UH-1N (+0.03 SF)

4 AH-1Z vs. 4 AH-1W (+0.36 SF)

6 F-35B vs. 6 AV-8B (+2.82 SF)

In single-role carrier configuration, America Class ships will embark 2 MH-60S helicopters for Search And Rescue, and take on 20 F-35B fighters plus all of the required spares, extra weapons, etc. Even so, the F-35B will have just 2 landing spots that can handle the heat from its engine: #7 and #9.

Floor footage wasn’t the only thing affected by the class’ escort carrier configuration. High-bay enlargement of the maintenance hangar in 2 areas was required in order to accommodate USMC MV-22s or AFSOC CV-22s, which can’t be brought in for full servicing on current LHA Tarawa and LHD Wasp Class ships.

A final aviation advantage comes from the addition of fuel tanks, in place of the ballast tanks used by the Tarawa and Wasp classes to offset the weight of a filled well deck. That more than doubles available JP-5 aviation fuel, from 600,000 gallons to a full 1.3 million gallons.

The Well Deck Issue

LHA 3 launches LCAC
(click to view full)

There’s a cost to these changes.

While it’s called an amphibious assault ship, the America class lacks those ship types’ characteristic feature: a floodable well deck for launching landing craft. The US Navy and Marines initially decided that there were enough other ships in the fleet with well decks, and contended that the use of LHA/LHD ships to transport and land heavy vehicles tends to be rare anyway. They eventually changed their minds, and “LHA 8″ may now include a well deck, but LHA 6 America and LHA 7 Tripoli will be built without.

Removal of the traditional well deck offers some advantages. For starters, it provides America Class Flight 0 ships with an extended hangar deck and aviation support spaces. It also lowers LHA/CVL America Class maintenance costs. In exchange, the America Class can’t launch and land medium-heavy vehicles like the USMC’s AAV7 amphibious armored personnel carriers, their future amphibious APCs; or LCAC hovercraft that can carry vehicles like M1 tanks, LAVs, and mine resistant MRAP-type vehicles ashore.

Lift-on/ Lift-off cranes, which could have mitigated this shortfall by transferring cargo to other ships, are also absent from the design. If LHA-R Flight 0 ships decide to carry heavier vehicles, or require faster offload given the 14,000+ pound empty weight of even very light mine-resistant vehicles, their sole options will be their CH-53K heavy-lift helicopters, or offloading by ramp onto a port’s docks.

Power and Influence: Secondary Ship Features

Naval LM2500
(click to view full)

Propulsion and power is the same hybrid system as LHD 8, which is a plus for the Navy. It involves 2 GE LM2500+ gas turbines, each rated at 35,290 shaft horsepower at U.S. Navy standard day conditions (100 degrees F), and a pair of 5,000 hp auxiliary propulsion motors. The hybrid propulsion system enables the ship’s propellers to be driven either by the gas turbines or by electric motors, which are powered from the ship service electrical system. This allows the ship to operate in a more fuel efficient mode throughout its speed range, while being able to generate far more electricity to power onboard electronics, etc.

Finally, the new class resembles its LHA/LHD predecessors in that will be able to operate as the flagship for a full expeditionary strike group. Its enhanced and reconfigurable command and control complex will be based on the US Navy’s directive to use open architecture electronics whenever possible, in order to lower costs and make future upgrades easier.

A hospital facility complements these advanced command and aviation capabilities when assisting in humanitarian operations, and serves the amphibious combat force. It’s about 67% smaller than USS Makin Island’s [LHD 8], as a result of expanding the hangar bay.

LHA-R: Contracts & Key Events

launch timelapse

Unless otherwise specified, all contracts are awarded by the US Naval Sea Systems Command (NAVSEA) in Washington, DC, to Northrop Grumman Ship Systems (now Huntington Ingalls, Inc.) in Pascagoula, MS. The company’s Ingalls operations in Pascagoula, MS is where the USA’s current fleet of Tarawa Class LHA and Wasp Class LHD amphibious ships were all built.

FY 2013-2014

LHA 6 nearing completion. LHA 8 will have a well deck.

America sea trials

Oct 11/14: LHA 6 Commissioned. The ship is formally commissioned at Pier 30/32 during San Francisco Fleet Week.

She is the 4th ship to bear that name, with predecessors that include a schooner, a World War I transport [ID-3006], and a conventionally-powered aircraft carrier [CV 66, 1965-1996]. Sources: US Navy, Full video and “USS America Joins the Fleet”.

USS America

Aug 26/14: Visits, F-35B Prep. LHA 6 America is visiting around South America on its way to San Francisco, with 4 MV-22B Osprey tilt-rotors, 3 H-60 Seahawk helicopters, and a special purpose MAGTF (Marine Corps Air-Ground Task Force) on board. The ship hasn’t even been commissioned yet, and they’re treating the visits to Trinidad and Tobago, Colombia, Brazil, Uruguay, Chile and Peru as a training cruise.

After PCU America’s commissioning and shakedown, a Post-Shakedown Availability visit to the shipyard expects to install modifications that will let the ship safely use F-35B fighters. To achieve that, intercostal structural additions will be inserted underneath flight deck landing spots numbers 7 and 9, in order to deal with the heat produced by the F-35B’s F135-PW-600 LiftFan engine. Those changes are currently being tested on the USS Wasp [LHD 8]. Sources: Defense Tech, “USS America Tours South America, Prepares for JSF”.

July 11/14: LHA 6. LHA 6 America leaves the Ingalls Shipbuilding division at Pascagoula, MS, sailing to the West Coast in preparation for her Oct 11/14 commissioning in San Francisco, CA. Sources: HII, “Ingalls Shipbuilding’s Amphibious Assault Ship America (LHA 6) Sails Away”.

June 20/14: LHA 7 keel. The official keel-laying ceremony for LHA 7 Tripoli takes places at HII’s Pascagoula, MS shipyard. Sources: HII, “Ingalls Shipbuilding Authenticates Keel of Amphibious Assault Ship Tripoli (LHA 7)”.

June 13/14: LHA 8. General Dynamics NASSCO in San Diego, CA receives a $23.5 million contract modification for early industry involvement in the LHA 8/ LHA(R) Flight 1 affordability design phase. LHA 8 is supposed to put the well deck back, pushing the design much closer to USS Makin Island [LHD-8]. Unfortunately, the ship has seen estimates as high as $4.4 billion. If the designers can reduce that figure, the ship’s odds of surviving coming budget battles will improve.

All funds are committed immediately, using FY 2014 RDT&E budgets. Work will be performed in San Diego, CA and is expected to be complete by May 2015. US NAVSEA in Washington, DC manages the contract (N00024-13-C-2401). See also HII, “Ingalls Shipbuilding Awarded $23.5 Million LHA 8 Affordability Contract”.

LHA 8 initial design

April 10/14: LHA 6 Delivery. HII’s Ingalls shipyard delivers the LHA 6 America to the US Navy in Pascagoula, MS. Commissioning is set for late 2014. Sources: US Navy, “Navy Accepts Delivery of the future USS America” | HII, “Ingalls Shipbuilding Delivers Amphibious Assault Ship America (LHA 6)”.

March 31/14: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs“. Which is actually a review for 2013, plus time to compile and publish. The report cites a high degree of rework on LHA 6, and the fact that they began construction with the design just 65% complete may have something to do with that. That has raised costs, and helped make the ship’s delivery 19 months late. Another $42.4 million will be spent on rework of the ship’s deck to cope with the F-35B’s exhaust and downwash (q.v. Jan 17/12). GAO adds that:

“Although not considered critical technologies, the program has identified an additional six key subsystems necessary to achieve capabilities. Five of these subsystems are mature. The sixth, the [GPS-guided] Joint Precision Approach and Landing System, is still in development, but LHA 6 can use backup aviation control systems to meet requirements. There are no new critical technologies expected for LHA 7 or LHA 8, but requirements for LHA 8 are still in development.”

Beyond the new deck design, design changes to LHA 7 will include a new firefighting system; and updates to the radar and the command, control, communications, computers, and intelligence systems. One hopes that key survivability upgrades (q.v. Jan 28/14) are also on this list. Design changes to LHA 8 will add a well deck that can accommodate 2 landing craft, and they’re considering designs that would allow compartments to be reconfigured in low-risk areas, in order to meet changing mission needs with less rework.

Jan 31/14: INSURV. LHA 6 America completes Navy acceptance trials off the coast of Pascagoula, MS. The Navy’s Board of Inspection and Survey (INSURV) evaluated all of the ship’s major systems, including combat, propulsion, communications, navigation, mission systems and aviation capabilities. It passed with no major deficiencies, which is a real achievement for a first-of-class ship. Delivery is planned for spring 2014. Sources: US NAVSEA, “LHA 6 Completes Acceptance Trials” | HII, “Video Release — Ingalls Shipbuilding’s Amphibious Ship America (LHA 6) Sails the Gulf of Mexico for Successful Acceptance Trials”.

Jan 28/14: DOT&E Testing Report. The Pentagon releases the FY 2013 Annual Report from its Office of the Director, Operational Test & Evaluation (DOT&E). The America Class is included, and some of its deficiencies aren’t really about the ship – but others are.

It has been known for some time that the SSDS combat system needs continued improvement, and test aboard Nimitz Class supercarriers indicate that some modern cruise missile attacks will overwhelm existing defenses. The technical term is “Probability of Raid Annihilation”, and LHA-R isn’t likely to meet the goal the Navy set (q.v. Jan 17/12). Some of that is traceable to the design, however:

“LFT&E analysis completed so far identified potential problems in susceptibility and vulnerability that would likely result in the LHA-6 being unable to maintain or recover mission capability following a hit by certain threat weapons, the details of which are classified. The Navy’s required updated analysis is behind schedule jeopardizing planning for follow-on ship survivability improvements…. In particular, some fluid systems need additional isolation valves, sensors, and remote operators to allow rapid identification and isolation of damage and reconfiguration for restoration of the mission capability they support. Additionally, the egress from some of the troop and crew berthing spaces may result in crew causalities and delay damage control actions. The Navy has plans to incorporate some corrective actions for follow-on ships.”

Nov 7-9/13: Builder trials for PCU America are conducted in the Gulf of Mexico. If all goes well she is to be delivered to the Navy in March 2014. LHA 6, the 4th ship named USS America, will join the Pacific Fleet and have San Diego, CA as its homeport. Initial Operational Capability (IOC) is scheduled for September 2016. Sources: HII, Nov 14/13 release | US Navy PEO Ships, Nov 7/13 release | DefenseTech: First America-class Amphib Nears Completion.

June 2013: LHA 8. The Navy plans to complete the Preliminary Design of LHA 8 during FY13, finalize its Capability Development Document (CDD) and Concepts of Operations (CONOPS), and get started on contract design. The Senate Armed Services Committee is somewhat skeptical and recommends the addition of $20 million to the LHA-8 (i.e. flight 1) development budget because “[r]epeated Navy shipbuilding programs have shown that failing to complete a ship’s design before starting construction inevitably leads to cost growth and schedule delays.” Senate NDAA FY 2014 report 113-044 | PE 64567N budget justification [PDF].

April 2013: The FY14 President Budget still sets the order of a 3rd LHA ship to FY2017 as of the latest FYDP. The delivery of LHA 6 is however delayed by 6 months. Vice Chief of Naval Operations Adm. Mark Ferguson had testified before the Senate Committee on Armed Services in February that this delay was one of the consequences of starting FY13 under a continuing resolution (CR) preventing the start of new programs.

Schedule as of April 2014

November 2012: The Navy conducts an operational assessment of LHA 6, though they don’t release any results publicly.

Oct 20/12: The US Navy christens Pre-Commissioning Unit America [LHA 6] at HII’s shipyard in Pascagoula, MS. USN.

FY 2012

LHA 7 main contract, named “Tripoli”; LHA 6 launch; DOT&E report highlight survivability fears against modern missiles.

LHA 6 berthed
(click to view full)

June 5/12: LHA 6 launch. HII launches LHA 6 America at Ingalls Shipbuilding in Pascagoula, MS. Instead of sliding down a ramp, the ship just floated free of a drydock – but first, the 29,000 ton proto-ship became one of the largest objects moved across land when it was translated to the drydock. HII.

LHA 6 launch

May 31/12: LHA 7 main contract. A $2.381 billion fixed-price incentive contract modification, covering LHA 7 Tripoli’s detail design and construction, and installation (but not the purchase) of Government Furnished Equipment bought under separate contracts. Work will also include crew familiarization, technical manuals, and engineering and post-delivery industrial services.

Work will be performed in Pascagoula, MS (92.5%); Charlottesville, VA (2.4%); Beloit, WI (1.5%); Ocean Springs, MS (1.4%); Santa Fe Springs, CA (1.2%); and Brunswick, GA (1%), and is expected to be complete by June 2018 (N00024-10-C-2229). See also US Navy.

LHA 7

May 4/12: LHA 7 Tripoli. The Secretary of the Navy picks USS Tripoli as LHA 7’s future name. This isn’t a reference to recent events, but to the USMC’s early battles against the Barbary Pirates, immortalized in the Marines’ battle hymn: “From the halls of Montezuma, to the shores of Tripoli…”

Appropriately enough, the 1st USS Tripoli was CVE-64, a World War 2 escort carrier that served in the Atlantic theater. The 2nd USS Tripoli was LPH-10, a helicopter carrier that served in Vietnam. US Navy.

April 4/12: A $50.3 million contract modification for additional long lead time material in support of LHA 7. Work will be performed in Pascagoula, MS, and is expected to complete by May 2013 (N00024-10-C-2229).

Feb 13/12: FY13 PB. The President’s budget request for FY2013 sets the contract award date for LHA 7 to May 2012, with construction to start in April 2013, and expected delivery in March 2018. A more expensive LHA 8 ship has also been added in FY 2017.

Feb 6/12: LHA 7 lead-in. A $9 million contract modification for additional LHA 7 long lead time materials. Work will be performed in Pascagoula, MS and is expected to be complete by May 2013 (N00024-10-C-2229).

Jan 26/12: LHA 7 delayed. Preliminary FY 2013 budget materials discuss coming shifts in Pentagon priorities, as the defense department moves to make future cuts. The America Class is involved:

“To ensure sufficient resources to protect these strategic priorities, we will reduce the number of ships by slowing the pace of building new ships and by accelerating the retirement of some existing ships. These include… Slipping a large deck amphibious ship (LHA) by 1 year.”

See: Pentagon release | “Defense Budget Priorities and Choices” [PDF]

Jan 17/12: DOT&E report. The Pentagon releases the FY2011 Annual Report from its Office of the Director, Operational Test & Evaluation (DOT&E). The America Class is included, even though they haven’t conducted testing yet. Some of the ship’s systems have been tested elsewhere, however, and their problems affect the ship. At the same time, some aspects of the design itself are being questioned, and so is ship survivability.

The good news is that LHA 6 will likely meet its Key Performance Parameters for vehicular stowage space, F-35B capacity, vertical take-off and landing spots, cargo space, and troop accommodations; but it will have much less hospital capacity than other American LHA/LHDs. DOT&E wonders if it will be enough.

The bad news is that LHA 6’s 12,000 pound limit for the vehicle ramp from the hangar deck to the flight deck, is a serious problem. Since the America Class has no well deck and no crane, everything must be airlifted ashore. There’s no point in having a ramp that can support 70-ton tanks and 24-ton LAVs, but even an up-armored HMMWV would stress the ramp as currently designed. Worse, blast-resistant MRAP or JLTV vehicles that could be airlifted off by a CH-53K, and would be necessary for many operations, couldn’t be carried on the ship. Those limitations are magnified by DOT&E’s statement that the USN and USMC haven’t yet produced a concept of operations or concept of employment that accounts for the America Class’ lack of a well deck, or that takes advantage of its enhanced aviation capability. On which note:

“Jet blast from the F-35Bs is expected to produce unsafe forces on flight deck personnel up to 75 feet from the short take-off line. MV-22 operations produce heat levels that might damage the flight deck and overwhelm the environmental controls in the spaces immediately below the flight deck.”

A full survivability assessment report is due in FY12, but DOT&E is concerned that:

“Due to long-standing and previously identified legacy sensor limitations, LHA-6 may be vulnerable to certain airborne threat flight profiles. Based on combat systems testing on other platforms, it is unlikely that LHA-6’s Ship Self-Defense System Mk 2-based combat system (including Nulka, SLQ-32, and Evolved Sea Sparrow Missile) will meet the ship’s Probability of Raid Annihilation requirement against anti-ship cruise missiles.”

This is true, but worth deeper analysis. Part of the problem is that there’s only so much weaponry one puts on ships like this. Its armament is actually substantially stronger than foreign LHDs like the Mistral or Juan Carlos/Canberra Classes, and matches up evenly against the Italian Cavour Class light carrier and amphibious support vessel. If advances in enemy weapons create a problem, other ships will have to compensate, or the cost of each NAAS ship would become very high indeed.

In this case, however, DOT&E is citing performance shortfalls against certain threat types by the ship’s component weapons: RIM-162 ESSM, RIM-116 RAM, Nulka, SLQ-32, and the ship’s radars. The radar shortfalls are a known issue, but unless the USN opted for a foreign radar design, there’s no reasonably-priced radar option that would fix them. As for the weapons, they are a real problem for the fleet, but extraneous to this one program. The long term solution is for their capabilities to improve, or the Navy to adjust its tactics to address their weaknesses, if it can.

FY 2010 – 2011

LHA 7 added to program, and lead-in buys begin; Any LHA 8 will have a well deck.

LHA 7 concept
(click to view full)

Aug 1/11: RAM. A $7.4 million contract modification for 3 refurbished and upgraded rolling airframe missile MK 49 Mod 3 Guided Missile Launch Systems with associated hardware, for use on LHA 7 (2 systems) and LCS 5 (Detroit, Freedom Class Littoral Combat Ship, 1 system).

Work will be performed in Tucson, AZ, and is expected to be complete by March 2013. Contract funds will not expire at the end of the current fiscal year (N00024-11-C-5448).

April 15/11: SAR to 2 ships. The Pentagon’s Selected Acquisitions Report ending Dec 30/10 includes the America Class under significant cost increases, for an obvious reason:

“LHA 6 – Program costs increased $3,458.9 million (+102.7%) from $3,367.9 million to $6,826.8 million, due primarily to the addition of one ship from one to two ships.”

March 31/11: LHA lead-in. A not-to-exceed $28.7 million contract modification for the procurement of additional long lead time material in support of “the LHA replacement flight 0 amphibious assault ship.” That could describe LHA 6 America, or LHA 7; timelines suggest that it probably means LHA 7.

Work will be performed in Philadelphia, PA (79.9%), and Pascagoula, MS (20.1%), and is expected to be complete by March 2014 (N00024-10-C-2229).

Oct 28/10: A $48.1 million contract modification for additional planning and advanced engineering services in support of LHA 7. Work will be performed in Pascagoula, MS, and is expected to be complete by May 2012 (N00024-10-C-2229). See also Northrop Grumman.

June 30/10: LHA 7 lead-in. A not-to-exceed $175.5 million cost-plus-fixed-fee contract for LHA 7 long-lead time material, planning, and advance engineering services. The as-yet unnamed LHA 7 will be an LHA-R Flight 0 ship just like America [LHA 6], which is now 25% complete. Long lead time materials include items like main reduction gears, which must be complete and ready to go very early in the build stage. With all contract options exercised, this contract could reach $193 million.

Work will be performed in Brunswick, GA (24.4%); locations yet to be determined (24.2%); Pascagoula, MS (23.1%); Los Angeles, CA (17.3%); York, PN (9.3%); and Brampton, Canada (1.7%), and is expected to be complete by March 2014. This contract was not competitively procured (N00024-10-C-2229). See also Northrop Grumman release.

March 30/10: GAO. The US GAO audit office delivers its 8th annual “Defense Acquisitions: Assessments of Selected Weapon Programs report. With respect to LHA-R, it says:

“The LHA 6 began construction in December 2008 with mature technologies, but [only 65%]… of its design complete… Approximately 45 percent of the LHA 6 design is based on the LHD 8. The Navy conducted two production readiness reviews to assess the shipbuilder’s readiness to commence full construction. In addition, as of September 2009, the program office had conducted unit readiness reviews for 141 of the ship’s 216 assembly units. The LHA 6 is likely to experience further cost growth because postdelivery rework of the ship’s deck may be necessary to cope with the intense, hot downwash of the Joint Strike Fighter… The Navy is planning to conduct aircraft tests on the LHD 1 during the fall of 2010, and will then determine whether the LHA 6 [and other ships that will operate it] need to modify their flight decks. The program office does not expect the Navy to finalize a solution for the LHA 6 prior to ship delivery…”

March 22/10: Gannett’s Navy Times:

“More than two years before the amphibious assault ship America enters the fleet, Marine officials have already drawn up early plans for a version of the ship that includes a major component America is missing – a well deck. The “LHA 8 concept,” as it was called in a presentation Monday by Marine Corps Combat Development Command, would combine new aviation features the Marines want in the America class with a traditional big-deck capacity for landing craft and green gear… the Navy’s most recent shipbuilding program includes no plans for such a ship… Navy Secretary Ray Mabus has said it would be prohibitively expensive to alter the designs for America or the follow-on LHA 7, so they’ll be built as planned.”

FY 2008 – 2009

LHA 6 keel laid; America Class.

RIM-116 RAM Launch

Aug 28/09: Well deck rethink? Information Dissemination reports that the Marines may be rethinking the removal of this class’ well decks:

“When the Marines decided to remove the well deck on the LHA (R) for USS America (LHA 6), it was a decision to move towards specialization. No surprise then that this year the Marines testified in front of Congress that the well deck will be added to future LHA (R)s as soon as possible, because just the removal of the well deck turned the LHA (R) into too much of a specialization for the Marines to overcome shortcomings in necessary sealift throughput.”

July 17/09: LHA 6 keel laid. Northrop Grumman Corporation holds the keel authentication ceremony for LHA 6 at the company’s Pascagoula facility.

Per Navy and maritime tradition, ship sponsor Lynne Pace had her initials welded onto a ceremonial steel plate noting the ship’s keel had been “truly and fairly laid.” Ms. Pace is the wife of retired U.S. Marine Corps Gen. Peter Pace, the first US Marine to Chair the Joint Chiefs of Staff. NGC release.

Oct 20/08: LM2500. GE’s LM2500+ gas turbines will power the USS America, which surprises no-one. The same engine was used on LHD-8, and its use in LHA 6 was expected from the outset. Northrop Grumman’s formal selection merely makes it official.

The LHA 6 ship’s mechanical-electric propulsion system will consist of 2 LM2500+ gas turbines, each rated at 35,290 shaft horsepower at U.S. Navy standard day conditions (100 degrees F), and a pair of 5,000 hp auxiliary propulsion motors. The hybrid propulsion system enables the ship’s propellers to be driven either by the gas turbines or by the electric motors, which are powered from the ship service electrical system. This allows the ship to operate in a more fuel efficient mode throughout its speed range, and also gives it more electrical capacity to power sensors and onboard equipment. MarineLog.

June 27/08: America Class. US Navy Secretary Donald Winter announces that LHA 6 would be named USS America when it is brought into service, a move that also names the ship class.

The new America would be the 4th ship in US Navy service to bear the name; the last such ship was CV 66, the Kitty Hawk Class aircraft carrier commissioned in 1965, decommissioned in 1996, and sunk as an 2005 experiment using explosives, torpedoes and naval gunfire. US Navy | Gannett’s Navy Times.

Class named

March 20/08: LHA 6. Northrop Grumman’s Sperry Marine business unit has been selected to supply the Machinery Control System (MCS) for LHA 6, under a contract valued at approximately $47.6 million. The contract work includes hardware, software, design, engineering, logistics, training, testing and shipboard integration support. It also includes an option for continuing logistics support of the MCS and its land-based test facility through the end of the LHA 6 ship guaranty period. The work will be performed at Northrop Grumman’s Sperry Marine facility in Charlottesville, VA and at the Pascagoula shipyard.

The MCS for LHA 6 will be a completely integrated network for monitoring and controlling the ship’s main propulsion plant and auxiliary systems, and will include more than 50 data acquisition units located around the ship, 25 operating consoles, 10 electric plant and propulsion plant controllers, and multiple redundant local-area network switches. It is based on a similar system being supplied by Sperry Marine for Makin Island [LHD 8], which has the same gas turbine propulsion plant, zonal electrical distribution and electric auxiliary systems. NGC release.

Jan 30/08: SSDS. Raytheon Co. Integrated Defense Systems in San Diego, CA received a $17.3 million modification to previously awarded contract (N00024-07-C-5105) for FY 2008 production of 4 “Ship Self Defense System (SSDS) MK 2 Tactical Ship Sets. SSDS will form the core of the ships’ self-defense capabilities, tying together, coordinating, and even automating the sensors, weapons, and decisions involved from detection, to engagement, to kill against anti-ship missiles etc. Raytheon will also conduct a special study to define engineering changes to the SSDS MK 2 product baseline in support of the LHA 6 Combat System configuration.

Work will be performed in Portsmouth, RI, and is expected to be complete by Oct. 2009. This contract was not competitively procured.

FY 2007 and Earlier

LHA 6 initial milestones.

F-35B vertical landing
(click to view full)

June 1/07: LHA 6 order. A $2.4 billion fixed-price incentive modification to previously awarded contract (N00024-05-C-2221) for the detail design and construction of the LHA 6 Amphibious Assault Ship. The LHA 6 LHA-R Class will replace the LHA 1 Tarawa. Work will be performed in Pascagoula, MS (95%) and New Orleans, LA (5%), and is expected to be complete by August 2012.

Philip Teel, corporate vice president and president of Northrop Grumman’s Ship Systems sector, is quoted in Northrop Grumman’s release:

“This contract award reinforces the U.S. Navy’s confidence that we have recovered from the effects of Hurricane Katrina and are capable of meeting the warfighters’ needs in a timely and cost effective manner.”

LHA 6

June 15/06: LHA 6 lead-in. A $20.4 million modification under previously awarded contract (N00024-05-C-2221) to exercise a cost-plus-fixed-fee option for special studies and procurement of additional long lead-time material, in support of LHA 6 ship construction. Work will be performed in Pascagoula, MS and is expected to be complete by December 2006.

Feb 13/06: A $93.8 million cost-plus-fixed-fee modification under a previously awarded contract (N00024-05-C-2221) exercises options to initiate engineering and detail design for the LHA-R Flight 0 Amphibious Assault Ship, and procure additional long lead time material in support of ship construction. Work will be performed in Pascagoula, MS and is expected to be complete by December 2006.

July 15/05: LHA 6 lead-in. A $109.9 million cost-plus-fixed-fee contract for advanced planning, long lead time materials, systems engineering, and special studies for the first LHA-R Flight 0 Amphibious Assault Ship. Work on this contract will be performed at t Work is expected to be complete by December 2006. The contract was awarded on a sole-source basis (N00024-05-C-2221). The total contract value, if all options are exercised, will be $264 million.

Aug 6/04: LHA 6 lead-in. FY 2005 Defense Appropriations Act includes $150 million for Advance Procurement related to LHA-R Flight 0

Aug 5/04: LHA-R CDD formally entered into JCIDS review process

June 17/04: Feasibility Design completed; results briefed to ASN (RD&A)

April 30/04: Required Capabilities Letter for LHA(R) Flight 0 issued by ASN (RD&A), CNO and CMC

Jan 23/04: ASN (RD&A) formally asks for additional cost vs. capability studies

September 2002: Analysis of Alternatives (AoA) Report re: possible range of ship designs completed

July 20/01: MS A Acquisition Decision Memorandum (ADM)

March 5/01: Mission Need Statement (MNS)

Nov 20/2000: NAVSEA’s PMS377 designated as LHA-R Program Managers

Footnotes

fn1. Spot factor figures, MV-22 maintenance, and fuel capabilities given in US PEO-Ships briefing presentation to the NDIA. [return to article]

Additional Readings

Background: The America Class

US Navy – Amphibious Assault Ships Fact File

US Navy SURFPAC – LHD/LHA

PEO Ships – Amphibious Assault Ships Replacement.

HII – LHA

Global Security – LH-X. LHA-R was the next step, and a significant change.

Background: Ship Ancillaries

DID – CEC: Cooperative Engagement for Fleet Defense

DID – RIM-162 ESSM Missile: Naval Anti-Air in a Quad Pack

DID – Phalanx CIWS: The Last Defense, On Ship and Ashore. LHA-Rs use Phalanx Block IB.

DID – RAM (Rolling Airframe Missile) Systems: Contracts & Events

DID – USN Ship Protection: From “Slick 32s” to SEWIP

DID – NGC Contracted for USN/RAN SPQ-9B Radars & Support.

DID – SSDS: Quicker Naval Response to Cruise Missiles. LHA-Rs use the combat system’s Mk.2 MOD 4B variant.

Background: Aircraft

DID – CH-53K: The U.S. Marines’ HLR Helicopter Program.

DID – Snakes and Rotors: The USMC’s H-1 Helicopter Program.

DID – MH-60R/S: The USA’s New Naval Workhorse Helicopters. Any LHx ship could also embark MH-60R helicopters for added anti-submarine punch, but distributed hosting on destroyers and LCS ships is almost always a better idea for the fleet.

DID – V-22 Osprey: The Multi-Year Buys, 2008-2017.

News & Views

Sea Power 21 – Doctrine circa 2002.

Naval Postgraduate School (June 2012) – Thesis on the effect of shipboard design decisions in amphibious warfare [PDF].

US NAVSEA (June 2005) – LHA-R Cargo Handling System Trade Study Models [PDF]. Back when the ships were planned with a well deck; sets out options et. al for cargo functions within that space.

Congressional Budget Office (Nov 1/04) – The Future of the Navy’s Amphibious and Maritime Prepositioning Forces. Notes that the Navy’s current plan risks industrial and capacity shortfalls.

National Defense Magazine (August 2004) – Navy Downsizing Could Weaken Marine Corps Expeditionary Posture.

Naval Surface Warfare Center Carderock Div (March 2004) – LHA(R): Designing the Next Generation of Big Deck Amphibious Assault Ships [PDF] with initial specs that are different from the final specifications.

DSpace at MIT, Department of Ocean Engineering (May 30/02) – LHA-R: Amphibious Assault Ships For The 21st Century [PDF]. An initial set of modeled concepts and discussion the includes extensive modeling work on a notional trimaran hull design, as well as a thorough look at the LHA-R’s required capabilities and various trade-offs. Interesting read, and a thorough discussion document.

Show more